DRDO and PSU's

Brahmos is powered by totally different technology.
Solid fuel booster+ liquid fueled ramjet.
As per AD our LFR is waiting for mass production. But we probably can't indigenise due to brahmos work share deal.

View: https://x.com/alpha_defense/status/1760603471211045362

We're still some years away from realising the LFRJ . Initially even I was given to believe we had already mastered the tech going by chatter on forums , YT videos , Twitter etc .

However it now turns out that we've confirmation it is indeed some years away from being realised. Apparently the cat was let out of the bag during the Swavalamban Seminar 2024 recently organized by the IN .
 
Last edited by a moderator:
We don't need external enemies when we have military genrols.

View: https://x.com/n_shekar_IND/status/1856672081536245993?t=_45LXdt1H5rgxIkGa_PFJA&s=19

Ab koi gaali nahi dega.


Yes, you can but only for DRDO, PSUs and MoD.

UN General's criminality being exposed on daily basis but Brown Sipoy always refuse to accept it.

What is difference between sending to gulag and being tried to treason?? But brown Sipoy will get offended.

But anyway, I am enjoying this shit show. images.webp
 
Yes, you can but only for DRDO, PSUs and MoD.

UN General's criminality being exposed on daily basis but Brown Sipoy always refuse to accept it.

What is difference between sending to gulag and being tried to treason?? But brown Sipoy will get offended.

But anyway, I am enjoying this shit show. View attachment 15179
I heavily criticize the IAF, but I strongly doubt that Safran would offer anything beyond directly selling their core. They would siphon off all the money, and we would receive no ToT under any circumstances.

We'd end up back at square one. To make progress with the Kaveri, we need the "Know-Why," not just the "Know-How" of the hot section, which is unlikely to be provided. The fully built hot section would likely come from France, with HAL merely assembling it, similar to the Shakti engines.
 

Zorwar army evaluation in 2025
Fmbt project name - Ranajit
 
Last report on tejas was ....
1. only 2 new f404 are available with hal ,so only 2 mk1a can be delivered
2. Hal will use catagory B engines for Building tejas mk1a , and airframes will be ready , when engines available ..will be fitted and tested
3. Tejas mk1a radar integration , delayed due to Israel war , tejas mk1a testing will take time ..




Free to Correct me.....
 
Last report on tejas was ....
1. only 2 new f404 are available with hal ,so only 2 mk1a can be delivered
2. Hal will use catagory B engines for Building tejas mk1a , and airframes will be ready , when engines available ..will be fitted and tested
3. Tejas mk1a radar integration , delayed due to Israel war , tejas mk1a testing will take time ..




Free to Correct me.....
If we are delivering mk1a what is this radar integration and testing?
 
Titanium will make the system way too costly, though.
It costed just 13 crores to Armenia I suppose even with titanium it shouldn't go beyond 20 crores which is still less than other artilleries.
They have reduced chamber size so maybe they won't need to use titanium for barrel it would need alot more of it. They're is already a shortfall for titanium in market no way they will go for it. Instead of they had to they can use in other components.
 
e're actually talking of the ADE here not exactly known for anything from achievements to quality. Calling it the most ineffectual labs of the entire defence ecosystem is actually paying it a compliment.
Really
ADE was behind the fly by wire controls for Tejas. They did this in less than a decade with peanuts.
Itcm is another success from ADE.
I hope Archer ng would achieve best what a piston powered aircraft could.
 

Latest Replies

Featured Content

Trending Threads

VPN-HSL-250-X250
Back
Top