DRDO and PSU's


Alpha Defense wala on how both Tapas engine vendors are controlled by countries hostile to India, one is Chini and the other is Kanedian

Need a comprehensive Engine development program and funding to develop and produce all types of engines within the country
 

DRDO walas pushing back over being ((( reformed ))) by vested interests in this article

Article itself is dry but the one comment posted there by a DRDO scientist is more hard-hitting


View: https://x.com/Firezstarter1/status/1787508574710804856

This guy has screencapped it in tweet.



Hope Gobiji and Ninda Turtle block this Dalal-Baboo-Jernail joint venture "reform committee"
 

Alpha Defense wala on how both Tapas engine vendors are controlled by countries hostile to India, one is Chini and the other is Kanedian

Need a comprehensive Engine development program and funding to develop and produce all types of engines within the country


Wild take. The engine spec for Archer engine is an simple diesel engine with 168 bhp and 512 NM torque. Inline 4 liquid cooled weighing 186kg.

Meanwhile Mahindra mhawk 2.2l diesel.
Power - 182bhp
Torque - 450NM

With gearing we can change torque output.
 
afaik , it takes almost 36 months from ccs to the ff right?
Around there but they already have an engine and 70cr sanctioned for the project already idk if it's enough thou or they gotta wait for CCS mind you they haven't sent the file yet so after its done And MOD takes its sweet sweet time we will all be waiting
 
Around there but they already have an engine and 70cr sanctioned for the project already idk if it's enough thou or they gotta wait for CCS mind you they haven't sent the file yet so after its done And MOD takes its sweet sweet time we will all be waiting
They dont have an engine , do they? Dry kaveri is still in testing and will be for the next year atleast . Maybe they will use a different engine in the prototype
 
They dont have an engine , do they? Dry kaveri is still in testing and will be for the next year atleast . Maybe they will use a different engine in the prototype
The last scoop was they will use a different engine for the first prototype before kaveri is certified nothing on it for a while.
 
1.Cell India is producing radomes of akash ng , seems Akasha ng is nearing production
2. After the recent vlsrsam test there will be some modifications with the canister
3. Existing pinaka lunch and reload vehicles will be modified for pinaka guided .
4.mpatgm is not dead , bdl is acquiring target aquisition systems for it - no- 3, also tenders for other sub systems
5.nag mk2 is in making from 2023 ,
6. Meny tenders are floated for helina , also subsytems for its integration
7.tender is out for ground luncher of m1 missile .
 

Latest Replies

Featured Content

Trending Threads

Back
Top