DRDO and PSU's

FICV is on the card anyway and the Zorawar chassis will be shared (albeit engine will go the front). For how long it's taking to finalize a BMP based system, and for a measly 4 ready-to-fire missiles, why not wait for the FICV to materialize.

I guess your DPSU guys are fedup of being abused by the "Customers" over delays so that's why they get stuff out of the door instead of spending time developing FICV or whatever else which will further malign their image.

Namica mk2 could serve as a test bed to get everything working, they could then transplant the same turret model to FICV/Zorawar chassis from the current BMP2-Pro-Plus-Max one.
 
No news source is reporting it apart from OSINT handles. Not even local Gujarati news.


Snehesh from Shekhar Coupta's website has reported it citing "Naval sources"

This was during vendor trials

Drone was ditched in the water and will now go back to the vendor( Adani or Israel is not mentioned? ) for them to investigate
 
Is this subh din of makar sankranthi turning out to be a black pill day for me? Wakeup and all I am reading today is blackpill news. 😢
Why? Rail lines have enough clearance on sides to take 3.59 m t 72
My point of posting this was to retail the diagrams in the forum not due to extended length

In my opinion even if we have to remove the LM/ATGM launcher it doesn't cause much operational issues as we can attach them after unloading from trains or transport aircrafts
Not very significant to be concerned
 
Some inputs
1. Lca mk2 side stick is made and will be in testing , for info tejas mk1a has center stick config
2. Modification is being done with vlsrsam luncher , weight reduction
3. Modification is being done with akash ng luncher , might be some inputs from user
4. Mpatgm might see user trial soon , bdl is making it
5. Astra mk2 nearing production
6. Tejas mk2 and mk1a models will be shown in aero india with modifications
7.uttqm aesa radar model will be shown in aero india
8.a carrier based uav is in pipeline , in very early stage
9. Ia is getting 16107 konkur atgms
10. Mig 29 is getting mated with hsld mk2
 
Is this subh din of makar sankranthi turning out to be a black pill day for me? Wakeup and all I am reading today is blackpill news. 😢
Welcome to blackpilled life (of defence enthusiast).
 

Attachments

  • Screenshot_20250114-225520.webp
    Screenshot_20250114-225520.webp
    232.6 KB · Views: 11
Since this was during acceptance trials, Adani (or IAI) should bear the entire expense and replace the drone.
End of the day the ones paying the real price (not just $s - blow to indigenous efforts, armed forces capabilities, forex) will be the nation. This one crash hardly puts a dent in Adani's overall balance sheet. But this idea of screwdriver giri is going to hurt us.
 

Latest Replies

Featured Content

Trending Threads

amazon-deals218
Back
Top