DRDO and PSU's

So, the next time a DFI/DFB-membaraan makes fun of DRDO's firearm division or questions the procurement of Robotic Kukkur..........yaad rakhna saalon, bach nahi paoge
View attachment 22758
Average DFI member when the black SUV parks outside your window.

1ff1e09e1473cd931d978f338355b272.jpg
 

View: https://youtu.be/0S4k-_AUOvQ?si=W1F03k4zXbkEsDbn

We've developed TBCs which can withstand 1800° - 2000°C temperature.


View: https://twitter.com/Amitraaz/status/1189464428426579968?s=19


View: https://twitter.com/Amitraaz/status/1881797593866650097?s=19

Considering the fact that TBCs in such HCMs only require to last for a few minutes I'm assuming work on it to last for the TTSL of a KED would need to be for at least 1-2000 hrs to begin with.

I'm further assuming if we don't get into a JV for the 120 KN TF, we'd probably need another decade to realize this technology. A JV then only helps us cut down on the development time.
 

Latest Replies

Featured Content

Trending Threads

Back
Top