• Members of the forum. We need donations to cover up hosting costs for 1-2 months. We have paid for Hosting for 8 months already. Due to some issues need to manage funds for 1-2 months. We are currently looking for around INR 13.5K. Any contribution is appreciated. Please reach out to @SKC over DM in case you all want to contribute.

DRDO and PSU's

Are those detachable pods that I see? Would make sense if pinaka now has non standard rockets. Even the normal guided pinaka is on a 4 missile pod as opposed to 6 in the normal one.
 
Daily reminder "Private Sector vs inefficient DPSU" is a red herring narrative spread by UN genrols, dalal babooze and their 🥄 in the media.

They don't want Kalyani's wares, they don't want neither Tata nor Mahindra's WhAps, but they are ok with Strykers 🪛 by BEML.
'They want strykers but not Tata WHaP' and yet they are failing strykers and passing WHaP in trials. There is only govt's misplaced policy of military hardware diplomacy or dalal influence at political level to blame . Blaming army is a misdirected angst
 
'They want strykers but not Tata WHaP' and yet they are failing strykers and passing WHaP in trials. There is only govt's misplaced policy of military hardware diplomacy or dalal influence at political level to blame . Blaming army is a misdirected angst

Trials pass ho jayenge, don't worry, Proven Imported maal hai, not some Arjun produced by 2rs DPSU right?
 
What was the type of Stryker we tested recently? Could it be the Sgt Stout which was tested? We also tested the Javelins. Asking coz this requirement - ADGM -SP has reached procurement stage . If you recall we had this conversation on DFI. @Corvus Splendens ; et al.
 
Yeh which event hai where drdo is showing its vares too? But lol at the end where the foldable rear broke off when reporter tried to open it.
Don’t think it broke off, I think those fools didn’t even mount it properly 😂.
 
What was the type of Stryker we tested recently? Could it be the Sgt Stout which was tested? We also tested the Javelins. Asking coz this requirement - ADGM -SP has reached procurement stage . If you recall we had this conversation on DFI. @Corvus Splendens ; et al.
It was a mobility trial, which it failed. So probably just M1126 with a .50 cal.
1740743240005.webp

Or an M1135 NBC proof variant.
1740743015824.webp
 

Latest Replies

Featured Content

Trending Threads

Back
Top