This thread will track updated on the in construction Dedicated Freight Corridors of India.
 
Dedicated Freight Corridors are a network of Broad gauge Railway lines with the objective of separating freight traffic from passenger traffic on high density routes in order to improve operational efficiency, reduce cost of operation and carry higher volumes of freight traffic.

Project is being undertaken by DFCCIL - Dedicated Freight Corridor Corporation of India which is working on two corridors:

1. Eastern Dedicated Freight Corridor starting from Ludhiana in Punjab to Dankuni in West Bengal.

2. Western Dedicated Freight Corridor from Jawaharlal Nehru Port in Mumbai (Maharashtra) to Dadri in Uttar Pradesh.

The two routes cover a total length of 3,260 KM.​
 
As od April 2024, Eastern DFC is fully operational and ~85% of Western DFC is operational.

Currently, EDFC is having 2x60 trains in operation daily and WDFC has 2x100 train operations. That is 320 trains daily. The plan is to take this to 400 trains daily by end of 2024. Track utilization stand around 50% currently. This needs to be increased with time and Govt should push more and more business to start using the corridors.​
 
The Detailed Project Review (DPR) of North-South and East-Coast Freight Corridor are being prepared has been submitted whereas the DPR for East-West DFC will be submitted by April-end (2024). The combined project value is expected to be Rs. 2 lakh crores.​
 
So the ones in the bold lines are built and the ones in dashed are being planned? We need another connection from Mumbai to Goa down all the way to Kerala.
Yes!

And there is caution with starting the new Corridors as the current two corridors went 3 times over the initial budget. Also, the track utilization is currently between 40-50%. Once this reach over 70-80%, we will start earning healthy revenue and have other corridors approved and in construction.​
 
Latest Updates from a recent interview of RK Jain, MD of DFCCIL:​
  • That last 100 km of WDFC in Maharashtra will hopefully be ready and in use by December 2025.​
  • There are 2x100 trains a day on EDFC, 2x60 trains on WDFC, 320 overall that they hope to get upto 400 by end of year​
  • Track usage is 40-50%, they are confident of taking it up to 150%​
  • Line segregation by DFC will reduce operational cost of running all trains​
  • All DPRs are sent, it's up to Railway Board.​
  • They are using WDFC for e-commerce deliveries, and want to get more cargo types on board​
  • They are looking to have automobile transportation from Sanand to Kanpur​
  • Waiver of 18% GST applies on DFC and is of a lot of help​
OP: skyscrapercity forum
 
Yes!

And there is caution with starting the new Corridors as the current two corridors went 3 times over the initial budget. Also, the track utilization is currently between 40-50%. Once this reach over 70-80%, we will start earning healthy revenue and have other corridors approved and in construction.​

Doesn't matter. We need to do it anyway. The gestation period takes rather a long time and time is the most valuable commodity. The DFC corridors will pay themselves back in short order.
 