DRDO and PSUs

BM-04 🇮🇳🕉🚀

IMO Boost glide & Pull up manuvers will give it ~2,500 Km Range

It has 3rd Stage in HGV (Hint : Inter stage 2/3)

Both AERO DYNAMIC & RCS present on HGV so its highly maneuverable in Both Exo & Endo atmo

1000005156.webp


IMO this BM-04 Can't be used to hit Ships / Moving targets bcoz its RV doesn't has any Controll mechanisms



View: https://x.com/prudhvitej32/status/1898764771996172501
 
how come we never talk about DRDO designed munitions that can take out moving targets, do they even exist?

inspite of having drones to do it now, surely there must be scenarios where such a capability would be required.
 
how come we never talk about DRDO designed munitions that can take out moving targets, do they even exist?

inspite of having drones to do it now, surely there must be scenarios where such a capability would be required.

I asked this during NAG trials. Was told the ATGMs go at such speed that 40-50kmph movement of a ground vehicle target becomes immaterial.

It's like trying to dodge a bullet by moving after it has been shot at you.
 

View: https://x.com/Prakhar81420407/status/1901115671087648780

Does anybody know this handle
He consistently claims that he has some connections through which he is sure govt will invest in engines in next 2-3 months
Not on this tweet but earlier tweets he had mentioned something like this

We are like barely 1 year into new government. As of now from what I have gathered from Gazillion Sources, the Government significantly want to shorten the time. If you look at requirements, it's nothing short of true fifth gen engine with 2000K Turbine Inlet Temperature. Jet Engine is Iteration based, usually before you even pull the Iteration based R&D, you first need testing mechanisms and precious data. Having a partner would save time and we don't have time nor resources to do what Chinese did.

Every single time people forgot one thing is that Chinese cracked CFM Engine technologies back in 1990s itself. They have persisted and only achieved the required engine in like 20 years after pouring some 10s of billions of dollars.

Our problem is not with Jet Engine alone but also the Machinery. What I speculate is part of the deal is smoothening the acquisition of those EBPVD and EBM Machines.
 

Latest Replies

Featured Content

Trending Threads

Back
Top