- Joined
- Jun 30, 2024
- Messages
- 55
- Likes
- 395
IMO we need 2 engine classes for our current indigenous jets.......
Class 1 -> Lets call it Kaveri MK 1 (Kaveri dry with brahmos afterburner)
Kaveri Mk 1 🕉
Dry thrust ~52 Kn
Wet thrust ~82 Kn
Additional Weight of kaveri engine will just effect payload by just ~150 kg
Application -> Dry varient in ghatak , Wet varient in Tejas MK1A
Timeline ~ in 5 years
Class 2 -> Lets call it Kaveri MK 2 (DRDO JV engine)
Kaveri Mk 2 🕉
Dry thrust ~ 80 Kn
Wet thrust ~ (120-132) Kn
Weight ~ (1,200-1,300) Kg
Application -> De-rated varient of max thrust of 110 kn for Tejas MK2 & TEDBF , Enhanced thrust varient of max thrust (120-132) Kn for AMCA
Timeline ~ in 10 years
Class 3 -> Kaveri MK 3 🕉 (Adaptive cycle engine based on DRDO JV engine expertise) FUTURE 🕉
Wet thrust ~ 180 Kn
6 th gen engine
Fluid thrust vectoring
CMC blades
Timeline ~ in 15 years
Application -> 6 th gen fighter jet , 2 engine flying wing bomber
Solution to our problems 🕉
GTRE projects "kaveri MK1 , MK2 & MK3 under PMO" with Ex DRDO chief & Ex DG GTRE as "project directors" with 15 Bn Funding in 10 years
1 x (IL-76/C17) & 2 x Su 30 mki as Flying testbed
High altitude aero test facility
Class 1 -> Lets call it Kaveri MK 1 (Kaveri dry with brahmos afterburner)
Kaveri Mk 1 🕉
Dry thrust ~52 Kn
Wet thrust ~82 Kn
Additional Weight of kaveri engine will just effect payload by just ~150 kg
Application -> Dry varient in ghatak , Wet varient in Tejas MK1A
Timeline ~ in 5 years
Class 2 -> Lets call it Kaveri MK 2 (DRDO JV engine)
Kaveri Mk 2 🕉
Dry thrust ~ 80 Kn
Wet thrust ~ (120-132) Kn
Weight ~ (1,200-1,300) Kg
Application -> De-rated varient of max thrust of 110 kn for Tejas MK2 & TEDBF , Enhanced thrust varient of max thrust (120-132) Kn for AMCA
Timeline ~ in 10 years
Class 3 -> Kaveri MK 3 🕉 (Adaptive cycle engine based on DRDO JV engine expertise) FUTURE 🕉
Wet thrust ~ 180 Kn
6 th gen engine
Fluid thrust vectoring
CMC blades
Timeline ~ in 15 years
Application -> 6 th gen fighter jet , 2 engine flying wing bomber
Solution to our problems 🕉
GTRE projects "kaveri MK1 , MK2 & MK3 under PMO" with Ex DRDO chief & Ex DG GTRE as "project directors" with 15 Bn Funding in 10 years
1 x (IL-76/C17) & 2 x Su 30 mki as Flying testbed
High altitude aero test facility
Last edited: