DRDO indigenous submarine proposal to go for CCS approval in couple of months; eight years for first sub
DRDO prepares to propose indigenous submarine design to CCS as part of Project-76, alongside Project-75I procurement deal.
www.thehindu.com
> Design to take 3 years from project sanction
> First sub to take 5 years to build
> 3000 tons displacement, cruise missile from torpedo tubes
> Continuation of ATV program( methinks this is ofc a Kilo-class pro plus max clone )
> The project is aiming for 90% to 95% indigenous content, with major systems being sourced domestically including the weapons, missiles, combat management system, sonars, communications, electronic warfare suite, mast, and periscope.( they forgot about the diesel engine i guess

)
> This means that the P-75I and P-76 programmes will progress almost in parallel, if the development of the latter goes as per plan.
DRDO will also have to make an upscaled AIP for this 3k ton submarine, patrakar hasn't given any details about this.
Let's hope this goes through smoothly and we start building the P76 subs like the chings did with their Type 39A which is a Kilo class with Chinese Characteristics