Kaveri Engine

Good news on Kaveri.

A dry thrust of 49-51kN and a plan to integrate to a 73-75kN with afterburner may not sound impressive, but using it for UAV applications building on it and commit to a Kaveri 2.0 for future sounds like a plan!

Gov should not give up on this, and go all in. If needed take help of the French or Ruskies by clubbing it with some other military deal.


View: https://x.com/idrwalerts/status/1871006619481604373?s=46


The next phase involves mounting the Kaveri engine on a flying test bed (FTB) for real-world performance evaluation. This step will include testing the engine’s response to various flight conditions, its integration with aircraft systems, and its overall reliability in dynamic environments:

As above line what would be the FTB now ??
 
I think GE sanctions comes as a good for us. Atleast it awakens the karveri. Kahin na kahin pahuch hi jayenge.
You say that as if GE sanctions are a fact. Any evidence?

GE say that the problem lies in a breakdown in their supply chain. Is that so difficult to believe when other aerospace companies have reported problems in their supply chains?

It is reported that the first 2 Mk1A's have been held up in delivery due to modifications requested by IAF. For all we know, if 10 engines had been supplied, 10 Mk1A's have been held up in delivery due to modifications requested by IAF.

Is GE being used as a convenient scapegoat to cover other, India-induced delays?
 
Good news on Kaveri.

A dry thrust of 49-51kN and a plan to integrate to a 73-75kN with afterburner may not sound impressive, but using it for UAV applications building on it and commit to a Kaveri 2.0 for future sounds like a plan!

Gov should not give up on this, and go all in. If needed take help of the French or Ruskies by clubbing it with some other military deal.


View: https://x.com/idrwalerts/status/1871006619481604373?s=46

IDRW apart from NYT are two of the most authentic news sources I’ve ever come across
 
You missed the auditing by SAFRAN along with the offer for "technical consultancy " as part of the offsets for the 36 nos Rafales we procured from France in the time period between 2016-19.

They also offered the core of the M-88 TF for an amount the MoD deemed too obscene . Regardless it was the same offer they extended nearly a decade ago to GTRE which IAF shot down.
Oh I see we used offsets to revalidate what was validated in Russia but this time by Safran and in France. I wonder what difference did it make to baseline perfo4mance figures of Kaveri? Was that good offset use?
 
IDRW apart from NYT are two of the most authentic news sources I’ve ever come across
In which world do u live bro
It's one of the most unreliable and clickbait site
I have constant asked mods to remove post containing idrw or block it if possible
 
Oh I see we used offsets to revalidate what was validated in Russia but this time by Safran and in France. I wonder what difference did it make to baseline perfo4mance figures of Kaveri? Was that good offset use?
From what I understand it was their consultancy which helped us get rid of the screech & flutter problems . However their opinion was that in its current form the Kaveri won't be able to generate an after burning thrust of 85 KN .

Basically the diagnosis of the problem was that for the way GTRE had constructed the TF , the only way for them to get to 85 KN was to reconstruct the TF else with the existing general arrangement the TF had then , it wasn't going to deliver the desired after burning thrust. For that GTRE would be better served by going in for a M-88 core.

MoD found it too expensive. In any case this same proposal was extended more than a decade before 2018-19 by SAFRAN which in turn was rejected by the IAF.

Reading between the lines , it seems GTRE learnt their lessons right from the consultancy & reconstructed the TF though it either took them 6-7 years to do so or they didn't get a favourable nod from MoD or IAF earlier which is to say before the present time. Your guess is as good as mine.
 
From what I understand it was their consultancy which helped us get rid of the screech & flutter problems . However their opinion was that in its current form the Kaveri won't be able to generate an after burning thrust of 85 KN .

Basically the diagnosis of the problem was that for the way GTRE had constructed the TF , the only way for them to get to 85 KN was to reconstruct the TF else with the existing general arrangement the TF had then , it wasn't going to deliver the desired after burning thrust. For that GTRE would be better served by going in for a M-88 core.

MoD found it too expensive. In any case this same proposal was extended more than a decade before 2018-19 by SAFRAN which in turn was rejected by the IAF.

Reading between the lines , it seems GTRE learnt their lessons right from the consultancy & reconstructed the TF though it either took them 6-7 years to do so or they didn't get a favourable nod from MoD or IAF earlier which is to say before the present time. Your guess is as good as mine.
So what's the thing with Brahmos building the Afterburner? Is it the newly designed one?
 
From what I understand it was their consultancy which helped us get rid of the screech & flutter problems . However their opinion was that in its current form the Kaveri won't be able to generate an after burning thrust of 85 KN .

Basically the diagnosis of the problem was that for the way GTRE had constructed the TF , the only way for them to get to 85 KN was to reconstruct the TF else with the existing general arrangement the TF had then , it wasn't going to deliver the desired after burning thrust. For that GTRE would be better served by going in for a M-88 core.

MoD found it too expensive. In any case this same proposal was extended more than a decade before 2018-19 by SAFRAN which in turn was rejected by the IAF.

Reading between the lines , it seems GTRE learnt their lessons right from the consultancy & reconstructed the TF though it either took them 6-7 years to do so or they didn't get a favourable nod from MoD or IAF earlier which is to say before the present time. Your guess is as good as mine.
Thanks Azaad.
 
So what's the thing with Brahmos building the Afterburner? Is it the newly designed one?
Seems to be so. This present TurboFan under construction is a completely new iteration of the existing Kaveri TF.
 

Latest Replies

Featured Content

Trending Threads

VPN-HSL-250-X250
Back
Top