Army Air Defence (AAD) Corps

Mail-SPL-468-X60-2x

Unknowncommando

Trainee
Member
Joined
Jul 5, 2024
Messages
1,735
Likes
8,583
ZU-23-2 maintenance
GXh5XCnaEAE9WOz
 
GY3nPYZaMAAYcn1

BEL has completed delivery of 100 Control Centres for Air Defence Control & Reporting System (Akashteer). BEL, through its DCCS SBU, started roll out of Akashteer in March '24 and had committed to deliver 100 Control Centres of Akashteer by 30th Sept '24.

GY3njGibsAAJggQ

The swift deployment of the 100 Control Centres, enabled by the guidance of Army Air Defence, Indian Army, highlights BEL's capability to cater to critical national security requirements and deliver strategic defence equipment on time.
 
For the Indian Army:

1. L70 and ZSU23 replaced by 220 AA guns initially (Two contenders - L&T and BF most likely). Further 938 guns will also be procured in the future.

2. Osa-AK and Strela will be replaced by QRSAM

3. Schilka and Tunguska will be replaced by 103 ADGMS-SP
 
For the Indian Army:

1. L70 and ZSU23 replaced by 220 AA guns initially (Two contenders - L&T and BF most likely). Further 938 guns will also be procured in the future.

2. Osa-AK and Strela will be replaced by QRSAM

3. Schilka and Tunguska will be replaced by 103 ADGMS-SP

Regarding Point 3. Is it we selected K-30 BIHO and then Russian got their panties twisted and put an spanner on this.

Yes, we have all the building blocks for this project. Just an will to do so.
 
Soon the Army's AAA gun program will reach trial stage. Two contenders are there: BHEL and L&T. The initial requirement is of 220 systems but the overall numbers will be around 1400. The selected gun will replace L70 and ZSU-23.
 
For the Indian Army:

1. L70 and ZSU23 replaced by 220 AA guns initially (Two contenders - L&T and BF most likely). Further 938 guns will also be procured in the future.

2. Osa-AK and Strela will be replaced by QRSAM

3. Schilka and Tunguska will be replaced by 103 ADGMS-SP
ADGMS-SP is still in design phase right? How many years would it take for it to get into the production & trials cycle.
 
VPN-HSL-468-X60-2x

Latest Replies

Featured Content

Trending Threads

Back
Top