Combat Air-Teaming System (CATS)

Mail-SPL-468-X60-2x
I think HVT sir talked about CATS warrior with shiv aroor I think and did say they have worked lots of experience on making a aircraft so making unmanned isn't hard only getting the control system is the hard part and we have worked with DRDO and "A Private sector" so this might be the private sector part he was talking about
 
1745425472877.webp1745425525098.webp
 
What's warrior 2 ?

Second prototype?
Big brother of warrior .
A bigger loyal wingman drone.

Current cats warrior uses two indegenious PTAE-7 engines, each produces max 3.73 Kn of thrust.
Total ~7.5Kn of thrust.( No afterburner)
1000010962.webp




Warrior 2 will use single HTFE-25 engine, which will produce max 25KN of thrust.(No afterburner).
1000010963.webp


Same HTFE-25, engine will also be used to create a stealth HALE UAV, As part of CATS(Combat air teaming system) program.
 
Same HTFE-25, engine will also be used to create a stealth HALE UAV, As part of CATS(Combat air teaming system) program.
Currently there seems to be no solid plan for such beyond a certain slide. Will take a decade or more.
 
The first prototypes of Abhimanyu are expected to undergo flight trials soon. These will include carrier landings, combat simulations, and coordination with manned jets. Each test will gather data to refine systems and eliminate bugs.




As per this.
 
Currently there seems to be no solid plan for such beyond a certain slide. Will take a decade or more.
These uav's are not that hard to make.
Unless you are trying to do something almost impossible, like achieving 30k feet flight altitude with usable payload using 2 piston engines( Tapas/rustom 2) to save "cost" , while all others just went with turboprop engines instead( now new indegenious engines developed for tapas are turboprop, and engine used in archer-ng is also turboprop).

Once HTFE-25 is developed, we have all the tech needed to make a HALE stealth UAV, so ~ 2030 is what I think for entering service.
 
These uav's are not that hard to make.
Unless you are trying to do something almost impossible, like achieving 30k feet flight altitude with usable payload using 2 piston engines( Tapas/rustom 2) to save "cost" , while all others just went with turboprop engines instead( now new indegenious engines developed for tapas are turboprop, and engine used in archer-ng is also turboprop).

Once HTFE-25 is developed, we have all the tech needed to make a HALE stealth UAV, so ~ 2030 is what I think for entering service.
~2030 is what I think for entering service for entering service.
Way too optimistic given Archer-NG itself has a pessimistic timeline. Weaponised version will be completed by 2028 for a basic armed MALE UAV.

Again, HALE UCAV is far away. Even the turboprop one by ADE/DRDO hasn't got CCS sanction. First they should induct CATS Warrior and Ghatak before 2030.

Heck, let HTFE-25 become operationally clear first, it still is under development.
 
Same creatures will be screeching for emergency procurement of Ghostbat or Valkyrie once Chinese flying the pic related in 4 times the pic's quantity

View attachment 21568

No support at the development level, no orders, no interest but they want flight and weapon testing in 2 months.

You are absolutely right bhai....That Kranti kaari started emergency procurement narrative of su57 to counter porkistani junk35
 

View: https://x.com/elitepredatorss/status/1878304835218608136

Dekho ek aur ssb chatne wala
The last line sums up his intellectuality
The guy doesn't know glitch about testing, certification, structural integrity, flight control systems debugging flutter analysis software integration interfaces but wants first flight and weapon(not in order wrote it in a flow) integration in 2 months

The audacity these guys have to ask people "have u cleared ssb"
Pehle engineering thik se padhle

1000008695.webp

Skip the tedious and expensive R & D which might cost you approx 20 years 🤣🤣🤣🤣🤣

SSB Gang is really dangerous 😳
 
VPN-HSL-468-X60-2x

Latest Replies

Featured Content

Trending Threads

Back
Top