Virupkha aesa radar , astra mk 2 , rudram anti radiation missiles , yodha & anidra EW suit , brahmos ng and that new AI cockpit ... Sukhoi ll dominate skies . I hope majority of the frame lasts till 2040 .
We are looking to develop new engine with Rolls Royce or Safran partnership in India so no delivering or withholding engine supply doesn’t arise. We will source all the necessary components from within India with holding IP and technology to manufacture we can mass produce the engine without any dependence on west. This is why M88 hot core mating to Kaveri was rejected. We desperately need an independent engine. AMCA will have our own engine it may get delayed if engine isn’t sorted out or we may go to Russian AL41/51 engines.Ideally they should have created 3 different designs and even prototypes with different engines( russian, french, us ) for each plane so in case somebody gets superpower keeda, feels extra greedy or cannot deliver the engines because of their war, we can use the other guy's engines.
But then all deshi fighter jet programs here are merely non-serious time-pass projects it seems.
Bookmark this, by 2027 burgerch0ds will pull the rug on F414
Redesign AMCA around RD-33, (call it AMCA-Mk1A) , yes its already very late, but you have no option because indigenous engine is not coming anytime soon or we will end up with nothing
exactly man, baseline k9 version with minor changes is at par with rd33I will ask Allah to give me 3000 Black Jets instead of using RD-33 from Russians. The baseline Kaveri is similar to RD33 and we can build the Engine by ourselves itself.
If we are going to shell out money for buying every foreign systems. Just throw the money on GTRE and let them cook the Engine. Just spending 1-2 billion so far with limited testing facility and no further support for them.
Meanwhile strong chinaman spend more than 20 billion to build those working 4th Gen engines.
Kaveri is still in lab, it's nowhere close to production,it still needs to mature & then it has to go to production, Mass production is entirely different game than design & development. Even if we start today, I don't think it will come by 2035I will ask Allah to give me 3000 Black Jets instead of using RD-33 from Russians. The baseline Kaveri is similar to RD33 and we can build the Engine by ourselves itself.
If we are going to shell out money for buying every foreign systems. Just throw the money on GTRE and let them cook the Engine. Just spending 1-2 billion so far with limited testing facility and no further support for them.
Meanwhile strong chinaman spend more than 20 billion to build those working 4th Gen engines.
Again good luck with zooropean partnershipWe are looking to develop new engine with Rolls Royce or Safran partnership in India so no delivering or withholding engine supply doesn’t arise. We will source all the necessary components from within India with holding IP and technology to manufacture we can mass produce the engine without any dependence on west. This is why M88 hot core mating to Kaveri was rejected. We desperately need an independent engine. AMCA will have our own engine it may get delayed if engine isn’t sorted out or we may go to Russian AL41/51 engines.
See this, I don't trust the ZooropeansWe are looking to develop new engine with Rolls Royce or Safran partnership in India so no delivering or withholding engine supply doesn’t arise. We will source all the necessary components from within India with holding IP and technology to manufacture we can mass produce the engine without any dependence on west. This is why M88 hot core mating to Kaveri was rejected. We desperately need an independent engine. AMCA will have our own engine it may get delayed if engine isn’t sorted out or we may go to Russian AL41/51 engines.
All is great just that upgrade timelines is 5 yrs away for 1st jet. Govt needs to do whatever it can to squeeze timelinesVirupkha aesa radar , astra mk 2 , rudram anti radiation missiles , yodha & anidra EW suit , brahmos ng and that new AI cockpit ... Sukhoi ll dominate skies . I hope majority of the frame lasts till 2040 .
See this, I don't trust the Zooropeans
View: https://x.com/akki_bauer22_/status/1924630148642406702
If you wanna do JV with them do it, but parallelly fund a fully indigenous 110KN engine programme as a backup, if not it will be a big L
Why for 40 years if its a stop gap. A production level AMCA in 2035 will become 80-90% capable of F35 then why should we carry F35's burden for 40 years. After AMCA becomes mainstay Let F35 be present in form of 2 squadrons for airshows or exercises, or say fukc it and chuck it to some eastern europoor in late 30s. That will be minute loss of few B$ which wont matter in 15 years, at the cost of getting autonomy back.If need arises for a stop gap 5th gen fighter we have only 2 options F35 ( become American bitch for next 40 years )
What does 2 squadrons of f35 accomplish as a "stop gap"Why for 40 years if its a stop gap. A production level AMCA in 2035 will become 80-90% capable of F35 then why should we carry F35's burden for 40 years. After AMCA becomes mainstay Let F35 be present in form of 2 squadrons for airshows or exercises, or say fukc it and chuck it to some eastern europoor in late 30s. That will be minute loss of few B$ which wont matter in 15 years, at the cost of getting autonomy back.