fire starter Trainee Member Joined Jun 30, 2024 Messages 1,882 Likes 23,874 Yesterday at 7:38 PM #6,201 DRDL is currently in the process of constructing a Tri-Sonic wind tunnel featuring a test section measuring 425 mm x 425 mm, designed for the testing of aerospace vehicles. The envisioned test duration spans from 30 to 40 seconds.
DRDL is currently in the process of constructing a Tri-Sonic wind tunnel featuring a test section measuring 425 mm x 425 mm, designed for the testing of aerospace vehicles. The envisioned test duration spans from 30 to 40 seconds.
Bhaubai Trainee Member Joined Jul 5, 2024 Messages 70 Likes 1,227 Yesterday at 8:35 PM #6,202 View: https://x.com/Ray70409890/status/1947308552831562033?t=xxp5QFlQxK6093TGh2_JMw&s=19
liberalredditor Trainee Member Joined Apr 22, 2025 Messages 1,518 Likes 3,989 Yesterday at 8:51 PM #6,203 If we had acquired al41 we could have used the peak power of virupaksha, short sightedness indeed from whoever did this.
If we had acquired al41 we could have used the peak power of virupaksha, short sightedness indeed from whoever did this.