Indian Navy Developments & Discussions


It's from a quite old (2020 iirc) tender/RFI/specification by DRDO intended for the manufacturing firm of VL-SRSAM. It was a 250 page pdf with details about each and everything. Even a small screw was specified in detail.

Had caused quite a bit of uproar back then as these kind of documentations are generally restricted.
 
It's from a quite old (2020 iirc) tender/RFI/specification by DRDO intended for the manufacturing firm of VL-SRSAM. It was a 250 page pdf with details about each and everything. Even a small screw was specified in detail.

Had caused quite a bit of uproar back then as these kind of documentations are generally restricted.
Only if we had an UVLS. 😞
 

Latest Replies

Featured Content

Trending Threads

Donate via Bitcoin - bc1qpc3h2l430vlfflc8w02t7qlkvltagt2y4k9dc2

qrcode
Back
Top