L&T are making the largest naval vessels the IN has ever ordered right now
The argument they don’t have expertise and should be kept out of frigates/destroyers when GSL got the Talwar order makes no sense.
L&T is doing everything asked of them in every defence space- air, land and sea, I don’t know why you’d throttle them back
If the IN was sensible they’d make NGF in enough units to sustain 3 yards making it in parallel
The PLAN are turning out destroyers like hot cakes and some want to limit some Indian yards to OPVs or do the 3+4 units, wait 10 years and repeat game
Ideally India would also have 2 lines running in parallel for attack subs (SSN are separate) but if P76 is ever going to be made it’ll be at MDL