Indian Railways

Mail-SPL-468-X60-2x
arts babus should not be alloted tech related ministries, heck dont allow arts guys in irts and other indian railway services, heck why do we have services in indian railway

make it a corporate sort of, bring toxic work culture for present babus, make them managers and force them to do work, then their corruption and slacking attitude will go away
 
Apparently Rail Babus came with a Redesigned Front section for an WAP 7.

This is how it looks.
1748317792335.webp

This rises the question of babus taste in so called Designs. Why can't they build an body looks similar to siemens , Stadler Locos. The above one looks like WAP 7 got bee stinged.
1748317859563.webp

1748317870503.webp

Even an Chinese locomotive looks good which his simple straight and angular lines which looks good on them.

1748317931409.webp


Even the twin WAP 5 for amrit bharat is look like this.

1748318047889.webp

While across the world Push Pull designs were like this.

Alstom one. Based on TGV Duplex which is an Push Pull train.
1748318145637.webp



Or the chinese DJJ2 which is also an Push pull train.

1748318264034.webp



The poor manufacturing standard is clearly visible at everything Rail factories manufacturing. VB with loose fitting. LHB Coaches which looks like pure shit and jerks like anything else due to coupling. Also the cleaning and maintenance is 50s era one. Folks clearly uses hand tools to tighten things when you can use proper tools which can tighten screws on factory fit.
 
Can someone tell me what was wrong with the WAG-9HH, that we're paying Siemens for a similar class loco.1748345521323.webp
 
siemens just handed over a dabba, agreed 11cr per loco hai, but still 0 design, just took our ld wcam design, took steel and painted it to appease leaderji

mf use aluminium, give us finesse and new paint scheme and liveries, literally sheds are doing better livery work now than as compared to CLW, BLW, PLW, BHEL etc and now siemens, mf even alstom and ge gave us somewhat good livery

arts babus have no technical knowledge and 0 aesthatic sense

i demand our head mod @haldilal to dismiss the railway board and give us aluminium vande bharat asap
 
siemens just handed over a dabba, agreed 11cr per loco hai, but still 0 design, just took our ld wcam design, took steel and painted it to appease leaderji

mf use aluminium, give us finesse and new paint scheme and liveries, literally sheds are doing better livery work now than as compared to CLW, BLW, PLW, BHEL etc and now siemens, mf even alstom and ge gave us somewhat good livery

arts babus have no technical knowledge and 0 aesthatic sense

i demand our head mod @haldilal to dismiss the railway board and give us aluminium vande bharat asap
Ya'll Nibbiars you must be familiar how the siemens got the contracts for the EMU's, MEU's, locomotive engineers, by bribing many officials in the Railways.
 
Can someone tell me what was wrong with the WAG-9HH, that we're paying Siemens for a similar class loco.View attachment 37469
I also don't know, maybe it's for export as Railway minister mentioned Siemens one will be exported.

This is quite perplexing why WAG was not chosen, someone is definitely telling lie about WAG performance.

Or, maybe Moon trials is not limited to only Armed forces, here too it happen.
 
VPN-HSL-468-X60-2x

Featured Content

Trending Threads

Back
Top