- Joined
- Jun 27, 2024
- Messages
- 197
- Likes
- 908
Updated list.
1. Launch status
2. Postponement of SPADEX and TDS-01.
3. New timeline for Chandrayaan-5.
Following launch vehicles have been in preparation work. I won't assign flight numbers to missions as that has been changing quickly.
PSLV - C61, C62, C63, N2 (N-flight d-notes privately built PSLV)
GSLV - F14, F16
SSLV - S1, S2
Orbital launches undertook in 2024
1. Launch status
2. Postponement of SPADEX and TDS-01.
3. New timeline for Chandrayaan-5.
Following launch vehicles have been in preparation work. I won't assign flight numbers to missions as that has been changing quickly.
PSLV - C61, C62, C63, N2 (N-flight d-notes privately built PSLV)
GSLV - F14, F16
SSLV - S1, S2
Orbital launches undertook in 2024
- 1st January - PSLV-DL C58 - RRI XpoSat (First dedicated mission to study cosmic X-rays)/POEM-3
[*][*]Radiation Shielding Experimental Module (RSEM) by TakeMe2Space to evaluate effectiveness of Tantalum coating for radiation shielding.
[*]Women Engineered Satellite (WESAT) by LBS Institute of Technology for Women to compare and measure UV radiation in space and on Earth's surface in real-time.
[*]BeliefSat-0: Amateur Band UHF to VHF FM voice repeater, and VHF APRS Digipeater satellite by K. J. Somaiya Institute of Technology.
[*]Green Impulse TrAnsmitter (GITA): Green bipropellant CubeSat propulsion unit by Inspecity Space Labs Pvt. Ltd.
[*]Launching Expeditions for Aspiring Technologies-Technology Demonstrator (LEAP-TD): P-30 nanosatellite platform subsystems validation by Dhruva Space.
[*]RUDRA 0.3 HPGP: Green Monopropellant Thruster by Bellatrix Aerospace Pvt. Ltd.
[*]ARKA200: Xenon based Hall-effect thruster (HET) by Bellatrix Aerospace.
[*]Dust Experiment (DEX): Interplanetary dust count measurement by Physical Research Laboratory.
[*]Fuel cell Power System (FCPS): Demonstration of 100 watt fuel cell power system by VSSC.
[*]Si based High Energy cell: Demonstration of Silicon based High Energy cells by VSSC
[*]VSSC's 100 W class Polymer Electrolyte Membrane Fuel Cell based Power System (FCPS)
[*]10 Ah Silicon–Graphite anode based high energy density Li-ion cell.
[*]Configured payload for testing Silicon–Graphite anode based Li-ion cell. - 17 February 2024 - GSLV F14 - INSAT-3DS - Success
- 7 April 2024 - Falcon-9 Bandwagon-1 - TSAT-1A, first of TASL's milsat constellation - Success
- 16 August 2024 - SSLV D3 - EOS-08 aka Microsat-2C/SR-0 DemoSAT by SpaceKidZ India (concludes development of SSLV, establishing it officially as operational vehicle for commercial use) - Success
- 23 November 2024 - Falcon-9 Block 5 - GSAT-20 - Success
- 4 December 2024 - PSLV-XL C59 - PROBA-3 x 2 satellites (European Coronagraphy/solar exploration satellite set) /MOI-TD (Takeme2Space) - AI enabled space based data center - Success
- 24 December 2024 - PSLV-XL C60 - SPADEX-1 x 2 (Space Docking and Recovery Experiment satellite set of 2 for future robotic missions)
- Q1 2025 - GSLV F1? - NVS-02 (Second L1 band satellite of NAVIC)
- Q1 2025 - PSLV-XL N1 - TDS-01 (Technology demonstration mission to test electric propulsion, indigenous atomic clocks and Travelling Wave Tube Amplifier (TWTA). Utilises BN/SiO2 built EPS thrusters with a thrust of 300 mN for all operations including orbit raising manuevers) , uses first privately built PSLV rocket
- Q1 2025 - GSLV F1? - NISAR (NASA ISRO Synthetic Aperture Radar) - First space based radar in world with dual frequencies. /
- H1 2025 - HLVM3 G1 - Gaganyaan-1, first unmanned Gaganyaan.
- 2025 (overdue from 2024) - GSLV F1? x 2 flights - GISAT-2 (EOS-05) or GISAT -1R
- 2025-26 (overdue from 2022) - GSLV F1? x 2 flights - IDRSS-1 (CMS-04) & IDRSS-2
- H2 2025 - HLVM3 G2 - Gaganyaan-2, second unmanned Gaganyaan.
- 2025 (overdue from 2024) - PSLV C? - RISAT-1B/POEM-4
[*]Quantum Entanglement Studies in Space (QuantESS) by SAC/PRL.[*]Atomic Oxygen Sensor (ATOXS) by SPL/VSSC
[*]PlasDEM (Plasmaspheric electron Density Measurements)
[*]Near Ultraviolet Transient Surveyor (NUTS)
[*]Smart Space Robot Experiment
[*]Potential experiments related to space robotics, proximity operations etc. - 2025 (overdue from 2024) - PSLV C? -DRDO ANVESHA (Hyperspectral payload/Space based Radar??)/CGUSat/LEAP-1 (Dhruvaspace)/SCOT
- 2025 (overdue from 2024) - PSLV C? -CartoSat-3A aka EOS-10
- 2025 (overdue from 2024) - PSLV C? -Undetermined commercial payload, Adayah, Drishti, Sanskardhaam, DS P30 x 2
- 2025 - PSLV-?? C? - JSSTU JNANAM (Student Sat)
- 2025 - LVM3 M? - Bluebird Block 2 (Blue Origin)
- 2026 - PSLV C? - TRISHNA (Thermanl Infrared Imaging Satellite for High Resolution Natrural Resource Assessment) /
- 2026 - GSLV F1? - NVS-03 (third satellite of second generation NAVIC)
- 2025 - SSLV S? x ? no. of flights - PARIKSHIT, Azista60°, Blacksky global and other commercial/NSIL payloads. /
- 2025-26 - Vikram series & Agnibaan series - Unknown number of flights and commercial payloads /
- 2025-26 - LVM3 M? x ? no. of flights - GSAT-21, 22, new NSIL communication satellite and commercial payloads /
- 2025-26 - PSLV/LVM3 C?/M? - SPADEX -2 x ??, second SPADEX mission, India's first elliptical Orbital docking mission to demonstrate docking technology for Cdy-4 Moon soil sample return mission.
- H1 2026 - HLVM3 G3 - Gaganyaan-3, third unmanned Gaganyaan.
- H2 2026 or H1 2027 - HLVM3 H1 - Gaganyaan-4, India's first manned space mission.
- 2026-28 - HLVM3 G4 - Unknown docking spacecraft name, India's first cargo supply mission to International Space Station. /
- NET 2027 - HLVM3 H2 - Gaganyaan-5, India's second manned space mission.
- NET 2028 - HLVM3 G5/B1 - BAS-B1, first module of Indian Orbital Station aka Bharatiya Antariskha Station.
- No later than 29 March 2028 - LVM3 M? - Venus Orbiter Mission aka Shukryaan-1, first Indian mission to Venus, may or may not include lander
- 2028 - LVM3 M? & M? (2 launchers at same time) - Chandryaan-4, India's first sample return mission to Moon. Orbiters, landers and ascenders with no rovers.
- 2030 - H3 (Japanese rocket) - Chandryaan-5 aka LUPEX or Lunar Polar Exploration Mission (Indo-Japanese lunar lander, rover and drilling mission) /
- 2028-35 - HLVM3 B2+ + NGLV rockets - BAS-B2+, follow on modules and assembly of Indian Orbital Station.
- NET 2031 - NGLV - ISS or BAS cargo payload, first flight of India's NGLV rocket.
- 2030 or later - LVM3/NGLV - ? x no. of flights - Indian Mars (IAD mechanism & Indian Mars Helicopter??) and Venus Landing Missions
- NET 2026 - RLV ORV - Unknown payload, first flight of GSLV based reusable launch system.
- 2027-2034 - LVM3/NGLV - Technology demonstration mission series for manned moon landings
- Astrosat-2
- Completion of BAS and further cargo missions: 2035+
- Chandrayaan-6 & 7 (RTEG based advanced sample return or long duration rover operation missions) - 2030s
- Pratush (India's moon based telescope) - 2027-34
- India's Lunar Relay and Navigation satellite constellation - 2029-32
- Crewed Lunar Orbital Mission (India's circumlunar manned spaceflight missions) - 2035+
- Unmanned Human Lunar Lander and Return Missions x 2 nos; each on two launchers: 2037-38
- Indian Human Soft Landing on Moon (using two launch vehicles): 2040
- Development of Bharatiya Chandrama Antariksha Station & further cargo missions (Indian Lunar Orbital Station) - 2040+
- Indian habitats and sustainable presence on Moon's surface and orbit - 2045+
- GSAT-7B, 7C, 7R.
- GSAT-32
- Resourcesat-3A & 3B.
- HRSAT
- Cartosat-3B
- DISHA x 2 (Disturbed and quiet time Ionosphere-thermosphere System at High Altitudes)
- AHySiS (Advanced Hyperspectral Imaging Satellite)
- Indian mission to Jupiter+Venus Fly by - 2030s
- Indian missions to outerplanets (Jupiter, Uranus, Neptune), their satellites - In study
- Indian Asteroid Landing Mission - Concept
- INSIST, ExWorlds and other large space based telescopes