Infrastructure

  • Like
Reactions: SKC
  • Like
Reactions: SKC
  • Like
Reactions: SKC
  • Like
Reactions: SKC
  • Like
Reactions: SKC
We have not heard a thing about two railway corridors from Delhi to Mumbai and Delhi to Howrah about to be finished. Can somebody update us on these.
 
We have not heard a thing about two railway corridors from Delhi to Mumbai and Delhi to Howrah about to be finished. Can somebody update us on these.
WDFC (Delhi to Mumbai) is done 90%, trains are running. Should be fully complete by end of 2025 or worst case 2026. Only 110 km left (Gholvad-JNPT).

EDFC (Ludhiana-Delhi- Dankuni) : Completed from Ludhiana to Sonnagar (Bihar). However, last 538 kms were supposed to be built in PPP. However, no private player showed up and there were also land acquisition issues. Last I heard railways were converting existing railway lines in that section to 4 lines. Apparently out of 538 kms, some 170 is already 4 line, so govt. was planning to make the rest 4 line as well. Not sure of progress of tha 4 lining project.
 

Latest Replies

Featured Content

Trending Threads

Back
Top