still stand by my point.
Current status quo suits all stakeholders you can name.
Tejas and the other atmanirbhar projects are all un-serious projects.
The blame game is also structured in such a way that it's spider-men pointing at each other.
No one party fears any danda of consequence because they can always point at the other guy
When Kolkata class was getting delayed, which was mainly because
>Admirals discovered the MF-STAR and Barak8 combo and had to mod the previous Soviet maal based design
>While the first Kolkata was built the Admirals suddenly wanted bow mounted sonar and this needed hull changes
>Barak8 was co-developed with jooz so this too faced some delays.
Now when patrakars wrote about this it was the navy only getting the blame, because they were leading the whole project top to bottom, even if MoD babooze, CAG babooze and Politicucks like Chidambaram would ask anything it would be Admirols only getting most of the blame( DRDO guys also get some ).
Only way to solve this
The push for domestic aircraft projects either has to come from PMO/DefMin( Remove NindaTurtle and get someone interested, like how Parrikar was )
or from IAF itself being given control of HAL with their own design group like WDB, ADA guys or just professional aeronautical engineers can be hired for this.
And most importantly, big budgets, ample funding, quick project sanctions.
Remember goys, eventually Tejas will get delivered, but the national focus should now be on AMCA and with the current ((( model ))) it's just not possible.