We have tried similar approach before too with Marut for reengining. Problem with this approach is a lot depends on goodwill of
a)forgien collaborator
b) Govt of the day
c) Budget allocation
d) Airforce
That's true of every foreign collaboration not just the F-414 or the forthcoming JV to develop a 120 KN TF.
The other conditions also hold true for any program - domestic or foreign.
I think there's a realisation more than ever in the GoI & MoD that they've goofed up massively when it comes to the IAF & its various programs not that IAF itself is blameless be it ACM Chaudhari's adamant attitude w.r.t to tendering MRFA instead of piece meal procurement of Rafales or their attitude w.r.t the LCA program. IAF too realise their blunder.
For all the blame we lay at HAL's door , not that they're blameless , let's not forget that productionizing a new item of the complexity of a 4.5 Gen FA involves complexities of a different order of magnitude especially given the fact that HAL up until that point in time was a production agency used to assembling out of a CKD or SKD.
All local developments involved mostly Indigenization of consumables mfgd from given engineering drawings by the OEM. The LCA was a different beast altogether.
To add to the complexity back in the day IAF & ADA got into a via media where 20 would be mfgd as per IOC specifications & 20 as per FOC specifications which came in 2019 . Then you had the Wuhan virus pandemic .
Also check for how long did it take to ink the agreement for the Mk-1a & when was the order released. IIRC , it took 3 yrs of negotiations . Then came news only 32 FAs would be mfgd & 8 nos trainers would be combined with 10 nos trainers which would be built as per Mk-1 FOC specifications.
How do you go about developing vendors in such a scenario & negotiate on price with them for such meager quantities ?
At any time any one them could pull the rug. Just like in Marut Case. Kabini core was result of the cumulative research for Marut engine exercise.
This is the first time I've come across news the Kabini core is based on studies conducted for the Marut TF
At that time too they were thinking advanced AMCA kind of succesor for Marut in form of HF 24. We know what happened.
Lots of versions. According to some MoD sabotaged it , as per some Dr Kurt Tank and / or his team did it , as per some the IAF did it & finally it was the Brits.
The most popular version is the Brits asked for an equivalent of ~ INR 5 cr to develop a new TF which'd be a perfect fit for the Marut which MoD or MoF denied funds for by which time the Soviets agreed to ToT for the MiG -21 & the Brit proposal was dropped.
We even explored the possibility of tying up with Egypt given the bonhomie between Nasser & Nehru who had a TF development program in collaboration with an European country ( don't recall if it was Germany or France or even UK ) which didn't go anywhere coz the TF program itself didn't materialise between Egypt & that European country.
No point going over Marut as of now.
Till we have a pro indigenization consisitent national defence policy just like 5 year plans. Indian Story in local aviation shall remain same more or less
Agreed.