GTRE GTX 35VS Kaveri

GTRE Director - 18:40 onwards


View: https://www.youtube.com/watch?v=a4OIUB1GCMg
  • Unsuccessfully "begging" people to get timeslots for the high-altitude test beds and flying test beds, probably in Russia.
  • No 50K hydraulic press.
  • Only spent $250 million when 10 times the amount is needed - $2.5 billion.
  • URGENTLY NEEDED - A coordinated national mission for aero-engines involving all stakeholders(and that probably would mean IAF not just sitting and ordering fighters and aero-engines like biryani in a restaurant. They need to be more proactively involved in making said biryani - maybe even earmarking part of their funds for R&D; exactly like responsible forces like USAF and USN do)
  • Need for more skilled manpower. He implies a 'Dutch Disease' phenomenon in India, where graduates are going to IT instead of deep tech in MTech.


What is the cause of this? And I mean seriously. Not just "oh babbu this babu that." I want to understand the thinking that lead to this mentality?
 
Should we be looking for crash debris to further our material science tech like 3D metal printing?? Our people probably think thats beneath us. I bet Chinese are camping there day and night to find it.


 
We are the largest customer country for both Airbus & Boeing by a large margin but can't afford a single flying test bed?

Issue of no funds saaar, budget constrains saaaar are long gone. It is now pure sabotage to keep foreign maal pipeline flowing
I think it's not only a test bed aircraft that lacks. But all the inboard installations to exploit the test itself, on time.
 
Drdo - iisc high shear atomiser for future gas turbine combustor.

The high-shear atomizer/gas turbine swirl cup finds application in gas turbine engines such as CFM-56,TALON-X combustors.
IMG_20250126_164845.webp

the present atomizer configuration shows
the ability to broaden the operating range (ALR) of a gas turbine engine with excellent performance.
 

Attachments

Drdo - iisc high shear atomiser for future gas turbine combustor.

The high-shear atomizer/gas turbine swirl cup finds application in gas turbine engines such as CFM-56,TALON-X combustors.
View attachment 23111

the present atomizer configuration shows
the ability to broaden the operating range (ALR) of a gas turbine engine with excellent performance.
Dehati Kersone burner ka exotic shehariya cousin... </sarc
 
I have a friend who is an Indian-American, very well trained PhD in MSE (material science engineering). I showed him the list of needed products and he said he's very familiar with a lot of them. But doesn't want to go to India because the salary is too low and he doesn't think the government takes R&D seriously enough to make it worth it for him.
Kidnap him and bring him here and put a gun to his head and make him work for Kaveri , Like how comrade Stalin used to do in the golden soviet days :)
 
The choice is stark. We either spend some 10 years at the very minimum realising this tech on a shoe string budget & delay the already delayed AMCA project or pay up get the technology we desire & move ahead with our plans .

The blame lies squarely with the Modi administration more than previous ones for not funding the GTRE adequately to realise tech they couldn't in previous attempts funding the program thru drip feed like previous administrations have done all along including this one .

Alternatively we learn lessons , get the JV quickly , invest in test facilities , identify tech like material tech beyond 2000°C which incidentally we aren't getting thru this JV too & we won't get from any JV , fund those attempts adequately , monitor it closely for progress , such that when we launch the 6th Gen FA program which we should before the end of the decade we utilise the learnings of the forthcoming JV marry it into our own realisation of tech thru these endeavours & develop our own 6th Gen TF instead of moving around the world for another JV for the TF.
Now what bugs me to hell is that all these decades GTRE is drip fed money, including by the current allegedly nationalist govt., but I can bet my bollocks that if some JV is cleared with a foriegn partner, somehow PMO baboos will find funds ! Why the eff not have funded the same monies to GTRE in the first place? We might have had an acceptable kaveri by now ala the chinka WS10 - nothing great but acceptable to productise with tejas and iterate on ...
 
Now what bugs me to hell is that all these decades GTRE is drip fed money, including by the current allegedly nationalist govt., but I can bet my bollocks that if some JV is cleared with a foriegn partner, somehow PMO baboos will find funds ! Why the eff not have funded the same monies to GTRE in the first place? We might have had an acceptable kaveri by now ala the chinka WS10 - nothing great but acceptable to productise with tejas and iterate on ...

Batman is scared of some CAG report saying that he wasted so many thousands of crores on "incompetent DPSU" because even the DRDO guys cannot give a proper timetable about Kaveri kab ready hoga.

Aside from that there is the pet-pe-laath of various un-elected professionals in the Govt if the Kaveri becomes a success.
 

Latest Replies

Featured Content

Trending Threads

Back
Top