This can also be termed passing the parcel. Previously the haggling was between the government & each individual service, now it'd be between GoI / MoD & the CDS's office on the one hand & on the other hand it will be between the CDS's office & individual services.

A direct consequence of this was the stand off between CDS Gen Rawat & ACM Chaudhari over the mode of procurement of the Rafales with the result things had to wait for the ACM to demit office for there to be any movement on this issue.

The CAPEX sure has grown . From ~ INR 1.7 lakh crores to ~ INR 1.8 lakh crores of which in case of the former only ~ INR 1.6 lakh crores could be spent by the services with the rest returned to the CFI.

The increase as you can see over last year's budgeted CAPEX is ~ 5.5% . Just about takes care of inflation IMHO.

not for defence and home ministries. this was done during parrikar's time and everyone's favourite tai continued with it, forces had complained that going for finance approvals all over again upon fiscal year lapse is increasing the time span of procurements.

technically unused funds never left consolidated fund of India, it's the allocation being rolled over instead of meter being reset to zero.
The Central government is considering stopping rollover of unutilised funds to the next financial year, barring in some key ministries such as defence and home affairs, in order to ensure better fiscal prudence and utilisation of funds among various ministries.

https://www.newindianexpress.com/bu...r-of-unused-funds-to-next-fiscal-1965333.html
 
not for defence and home ministries. this was done during parrikar's time and everyone's favourite tai continued with it, forces had complained that going for finance approvals all over again upon fiscal year lapse is increasing the time span of procurements.

technically unused funds never left consolidated fund of India, it's the allocation being rolled over instead of meter being reset to zero.


https://www.newindianexpress.com/bu...r-of-unused-funds-to-next-fiscal-1965333.html
Indeed ! So the way I understand it is of the last year's CAPEX of INR 1.72 lakh crores only INR 1.6 lakh crores could be spent.

Of the balance budgeted amount of INR 12 ,000 crores , the current CAPEX is hiked to the tune of INR 8,000 crores. That's still a loss of INR 4,000 crores.
 
Navy doesn’t operate single engine jets on career and they’re range less to operate from shore based facility.
Does the Sea Harrier not ring a bell🤷🏼‍♂️? It had a single Rolls Royce Pegasus 106 engine.
It’s more likely that due to the low real estate onboard, they’d rather have an Aircraft with more legs. Though I still see merit for the Dual Seat Trainer version of the LCA-N.
 
Does the Sea Harrier not ring a bell🤷🏼‍♂️? It had a single Rolls Royce Pegasus 106 engine.
It’s more likely that due to the low real estate onboard, they’d rather have an Aircraft with more legs. Though I still see merit for the Dual Seat Trainer version of the LCA-N.


Weapons loadout is poor in N-LCA. Other than that it is satisfies the Navy, we are manufacturing N-LCA for some time. Navy is looking it as an advance trainer which can do carrier landing - take off practice. Then move forward to MIG-29K and Rafale.
 
While we are sad about the TEDBF timelines. I think the timeline is something true from ADA perspective.

Reasons:

1. Till now the program is supported only by Navy.
2. IN operates two AC with 3rd AC will not going to come soon. We postponed it for more SSK and other ships.
3. Now the case of TEDBF is even less. IN wants the Rafale-M 26 units to support ACs. This is more than enough for current Carriers we have.
4. With no support for TEDBF, program went down in priority list. IAF is in dire strait due to raising tech gap and the following programs like MWF, AMCA taking major priority.
5. Thus the current timeline where MWF followed by AMCA.
6. TEDBF have an outside chance, if IAF get on board. Since it is benchmarked against Rafale with similar performance. But IAF will not through away MRFA. Thus again the priority goes down.
7. 2040 is a tricky period. If AMCA goes smoothly, IN will simply jump to 5th GEN bandwagon.
8. At present TEDBF may become a paper plane if AMCA become success.
 
Indeed ! So the way I understand it is of the last year's CAPEX of INR 1.72 lakh crores only INR 1.6 lakh crores could be spent.

Of the balance budgeted amount of INR 12 ,000 crores , the current CAPEX is hiked to the tune of INR 8,000 crores. That's still a loss of INR 4,000 crores.

the exact number of actuals for current fiscal, we will it from next year's budget document. i had made a table of actuals vs budget in the previous forum, they have been years where this gormint has spent more than the budget. if there is a genuine case, this gormint will spend more than allocated budget, that's not an issue.
 
This can also be termed passing the parcel. Previously the haggling was between the government & each individual service, now it'd be between GoI / MoD & the CDS's office on the one hand & on the other hand it will be between the CDS's office & individual services.

A direct consequence of this was the stand off between CDS Gen Rawat & ACM Chaudhari over the mode of procurement of the Rafales with the result things had to wait for the ACM to demit office for there to be any movement on this issue.

The CAPEX sure has grown . From ~ INR 1.7 lakh crores to ~ INR 1.8 lakh crores of which in case of the former only ~ INR 1.6 lakh crores could be spent by the services with the rest returned to the CFI.

The increase as you can see over last year's budgeted CAPEX is ~ 5.5% . Just about takes care of inflation IMHO.

Capex growth which I assumed as 10% per annum on average is over longer term. It won't be linear growth.
In lean years it will be low and in years of big bang deals it will be high.

Any which way our procurement policies are still a mess. So government signal is clear they will only budget upon what forces can actually spend.
As other members pointed out govt will spend more than budget if required.

Good thing is more and more domestic procurement means our capex goes further and further every passing year.
 
Does the Sea Harrier not ring a bell🤷🏼‍♂️? It had a single Rolls Royce Pegasus 106 engine.
It’s more likely that due to the low real estate onboard, they’d rather have an Aircraft with more legs. Though I still see merit for the Dual Seat Trainer version of the LCA-N.
The SHAR was a compromise and if you think about it, the SeaHawk was also single engined - the problem is IN lost too many SHARs and consequently too many pilots to ever seriously take a singe engined fighter seriously. Even the Goshawk which is the navalised Hawk trainer used by the USN only operates when the carrier is close to the airbases in continental US.
 
The SHAR was a compromise and if you think about it, the SeaHawk was also single engined - the problem is IN lost too many SHARs and consequently too many pilots to ever seriously take a singe engined fighter seriously. Even the Goshawk which is the navalised Hawk trainer used by the USN only operates when the carrier is close to the airbases in continental US.

Do you think that TEDBF will be obsolete by the time it gets ready for production in 2038?
 