Infrastructure

  • Like
Reactions: SKC
  • Like
Reactions: SKC
  • Like
Reactions: SKC
  • Like
Reactions: SKC
  • Like
Reactions: SKC
WDFC (Delhi to Mumbai) is done 90%, trains are running. Should be fully complete by end of 2025 or worst case 2026. Only 110 km left (Gholvad-JNPT).

EDFC (Ludhiana-Delhi- Dankuni) : Completed from Ludhiana to Sonnagar (Bihar). However, last 538 kms were supposed to be built in PPP. However, no private player showed up and there were also land acquisition issues. Last I heard railways were converting existing railway lines in that section to 4 lines. Apparently out of 538 kms, some 170 is already 4 line, so govt. was planning to make the rest 4 line as well. Not sure of progress of tha 4 lining project.
Is that because it’s in West Bengal ?

Mod Alert: avoid use of abusive/foul words
 
Last edited by a moderator:

Latest Replies

Featured Content

Trending Threads

Back
Top