- Joined
- Feb 5, 2025
- Messages
- 616
- Likes
- 2,997

Seems like HAL wants it for less than 2k crores.
yes...but STAR nd brahmos hv similar liquid fuelled ramjet engine...so we can develop a super cruise missile like brahmos from STAR target testing platform in future. we r not hearing anything about brahmos NG development. so i was saying may be they want our own mini brahmos later from STAR missiles.
i dont think brahmos NG alternative lie in project ITCM nd vishnu. coz brahmos NG is supercruise missile is based on ramjet engine. meanwhile subsonic missile ITCM is based on turbofan engine nd hypersonic vishnu missile will be based on screamjet engine.
Actually phanboys are blaming AMPL now instead of HAL lmao. Not here but on X. Blaming GoI for unnecessarily pushing private players when well established PSUs like BEL was there. PSU phanboys are doing everything to save face of HAL who is probably the one behind delay of certification of SVK to begin with.I am dropping by in this thread to listen to desi phanboys tipping their fedora hats and going
"acctually.... IAF is responsible for Tejas delay, don't blame PSUs, also laal salaam comrades !"
IAF chief was right about these loonies, they should import hundreds of more Rafales instead of wasting time on these babus.
View: https://x.com/alpha_defense/status/1939010590732886318
Isme merit kaha se aya sir. It's just corruption through and through. DRDO has done its job and even suggesting practical solution. It's HAL being Dalal again.Happens when DRDO and HAL both dont hire based on merit
Fuckin clowns
Isme merit kaha se aya sir. It's just corruption through and through. DRDO has done its job and even suggesting practical solution. It's HAL being Dalal again.
"DRDO officials point out a viable alternative—integrating the Uttam radar with imported EW systems until the SRK suite receives complete certification. In fact, making HAL’s decision even more perplexing, in a recent internal communication to HAL and DRDO in April, CEMILAC stated that the Uttam radar had completed four phases of flight trials. Additionally, the radar hardware had undergone qualification tests according to the LCA Mk1A’s requirements. To facilitate the induction of the radar, CEMILAC recommended commencing production of the radar subsystems, with HAL’s avionics division in Hyderabad serving as the lead system integrator."
Uttam + Israeli EW is possible but HAL don't wanna accept that solution..