- Joined
- Jul 1, 2024
- Messages
- 2,478
- Likes
- 10,834
HJT has been designed around the AL-55I . For them to go to the HTFE means redesigning the entire thing. As it is the entire program has been delayed by 20-26 yrs. Besides as per Saurav Jha in one of his IAH programs on DDR stated that we can expect the HTFE by 2027-28. Whether we'd actually get it by then is anyone's guess.I thought HAL would have concentrated on HFTE 25 if anything, that would have nicely gelled with stretchable timeline HAL IJT.