- Joined
- Jun 30, 2024
- Messages
- 1,163
- Likes
- 2,178
Chinese trollAK-630 is a weapon of last resort, if the Navy does not see a problem in using the original design then I don't know why people are crying and cribbing over it.
Chinese trollAK-630 is a weapon of last resort, if the Navy does not see a problem in using the original design then I don't know why people are crying and cribbing over it.
Did IN always have a Photo Branch or is it something new that they initiated like western militaries? @Binayak95
View attachment 7892
View attachment 7891
View attachment 7890
View: https://x.com/IN_RAJALI/status/1828480848326496641
A serious matter of concern, BHEL needs to expand its production capacity to support the construction of new hulls. 32-33 new ships will require SRGM in the next ~10 years.No 76mm gun mounted on INS Nilgiri. Perhaps a shortage in vital components from OEM.
Is it still gonna be half assed Atmanirbhar Bharat with Imported Everything or would it gonna have any Indigenous Radar or Indigenous Missiles like SRSAM. How much long time do they need for a Naval Radar? Its been like years.
Deal for 16 additional 76mm guns wa signed on 28th November 23. It is possible that additional fresh deliveries of SRGM haven't started yet for P 17A.A serious matter of concern, BHEL needs to expand its production capacity to support the construction of new hulls. 32-33 new ships will require SRGM in the next ~10 years.
6 NGMV, 11 NGOPV, 8 NGC, 7-8 P-17A
Not including -
3 CTS, 2+2 MPV, possibility or SRGM on 6+6 ICG NGOPV.
It's time for us to look for another vendor for SRGM.
https://www.republicworld.com/defen...bhel-for-indian-navy-s-super-rapid-gun-mountsThe Ministry of Defence concluded a crucial agreement with Bharat Heavy Electricals Limited (BHEL) in Haridwar, marking the procurement of 16 Upgraded Super Rapid Gun Mounts (SRGM) and associated equipment for the Indian Navy, on Tuesday November 28. Valued at ₹2956.89 Cr under the Buy (Indian) category, this contract signifies a strategic move to bolster the nation's maritime defence capabilities.
In a major boost to Defence Production under the ‘Make in India’ initiative and towards achieving self-reliance in the critical field of Defence equipment, Goa Shipyard has placed a maiden order on Bharat Heavy Electricals Limited (BHEL) for supply of an upgraded Super Rapid Gun Mount (SRGM), the Main gun onboard most Warships of the Indian Navy.
The order envisages supply, installation and commissioning of the entire system – Upgraded SRGM and accessories for Triput Class Frigates of the Indian Navy, which will be manufactured by the Haridwar unit of BHEL.
Are they still gonna say "Muh R&D budget" ? What exactly is causing so much wastage? Is it inefficiency of PSU Shipyards or Imported Gold Plated Content?1.2 billion per ship??!! That's gotta be overpriced for what we'll be getting.
1.2 billion per ship??!! That's gotta be overpriced for what we'll be getting.
Guys we will get a lot of indigenous sub systems here like lrmfr new missiles sensors etcAre they still gonna say "Muh R&D budget" ? What exactly is causing so much wastage? Is it inefficiency of PSU Shipyards or Imported Gold Plated Content?
In Nilgiri Class, the imported and semi-imported contents(licensed manufacturing/joint venture) areGuys we will get a lot of indigenous sub systems here like lrmfr new missiles sensors etc
All are indigenous and first of all first time being produced so u need to pay for them to establish manufacturing plant and logistics for the sub-system as being manufactured and ordered first time
U can't see a vessel like a single unit
And moreover u guys are following these topics for many years u must know AoN generally comes with all considerations so the cost quoted is high
Wait for dac approval after completion of rfp stage and then ccs then u will know the exact cost
LOL, no. P 17B is gonna be a ctrl+c - ctrl+v of its predecessor.Guys we will get a lot of indigenous sub systems here like lrmfr new missiles sensors etc
All are indigenous and first of all first time being produced so u need to pay for them to establish manufacturing plant and logistics for the sub-system as being manufactured and ordered first time
U can't see a vessel like a single unit
And moreover u guys are following these topics for many years u must know AoN generally comes with all considerations so the cost quoted is high
Wait for dac approval after completion of rfp stage and then ccs then u will know the exact cost
Hope you're right, otherwise, it's gonna be a huge rip off.And moreover u guys are following these topics for many years u must know AoN generally comes with all considerations so the cost quoted is high
Wait for dac approval after completion of rfp stage and then ccs then u will know the exact cost