Indian Navy Developments & Discussions

There is no actual NGD design in public nor are there any confirmed specs.

The 3D render is an Italian DDX design that has been used in a certain IN video showcasing cooperative engagement capability.

Unfortunately we can only speculate and hope( or cope )

There are many complexities to the NGD project, from the actual ship design and building to sub-systems like LRMFR radar and Kusha SAMs which are also under development.

If all goes well however this will be the truly Make in India ship apart from the engines which will be RollsRoyce because of the Admiral's love for IEP.

It's a thought experiment so everything should be taken with 2 spoons of salt.

Integration of an advanced pseudo-VLS based SAM system (possibly designed for 10,000+ ton warships) and MRMFR has been successful as a proof of concept on INS Avnesh.

5xefy9zoaap71.jpg


This is Project Kusha (Indian Barak 8 ER) which replaces/ adds the following components to MRSAM:
  • Astra Mk 2 sensor instead of Israeli one
  • Additional booster phase for more range
  • Range increase from 90 km to 250 km
  • Speed increase from M. 3 to M. 7
PROJECT-KHUSH2.webp

80752921_2647840391918110_4515281371479932928_n.webp

screenshot-2021-04-19-at-14-16-51-e1618836720542-png.25395


Given the change in length and accounting for a width increase due to the addition of the booster, a bigger VLS is required.

Since the Ship Launch System (SLS) can fit the AD-1 and AD-2 which is twice the length and width of the XRSAM/ Project Kusha (compare with Akash), we can probably fit 2 x XRSAM into a SLS by volume with some modifications.

Given the fact that the NGD will be 10000-13000+ tons I expect the vessel to have enough depth to fit at least 32-48 x SLS sized VLS (64-96 XRSAM).

SAM+Comparisons.jpg


If we remove the booster section of the LRAshM (6-7 m length with a range of >1000 km), we can probably fit it into an SLS style VLS as well with a lightly increased width.

There could be 24-32 x SLS sized VLS dedicated for AShM roles.

GchkLk_aMAE1xN7.jpg
 
It's a thought experiment so everything should be taken with 2 spoons of salt.

Integration of an advanced pseudo-VLS based SAM system (possibly designed for 10,000+ ton warships) and MRMFR has been successful as a proof of concept on INS Avnesh.

5xefy9zoaap71.jpg

Thanks for the INS Anvesh infographic, I knew the LRMFR was tested on it but didn't know how it looks on ship

Also this SLS is under research in the USN also, to add firepower to their San Antonio class LPD,


It's called Mark 70 PDS over there

1737051624099.webp

Chings also have something similar.
 

As good as this is and it very much is this is more of a Modi PR moment than a direction of travel. A similar induction day like this isn’t in the IN’s future for the foreseeable decade because they haven’t moved anywhere with follow ups


View: https://x.com/ksingh_1469/status/1879577229522608634?s=46

This is something I’ve been repeating for a while and there are things to commend but this has also been an obvious emerging situation over the last 5 years.

The only real mitigation they seem to take is the P-17B but by the time that’s in the yard there won’t be any other PSC in production, the fits and starts the Indian military procures in is beyond frustrating. There should be a constant stream of equipment preceded by a constant stream of orders

No wonder the IN keeps downgrading their projected fleet size, they’ve given up on being a 200 boat navy I notice
 

Patrakar gives some details about INS Nilgiri straight from it's captain.











The Captain says that the ship is supposed to be guard-rail-mukt so as to stealth-maxxx, but as the pictures we have seen show there are still guard-rails?
Perhaps they are not confident of the "deck-rail system" and need to still test it out further?
Gotta love the IN’s iterative approach, constantly refining unlike retards in the other services that sit still and wait for an a$$ whooping before ‘emergency’ procurements rain


Strales and deck rail to be the ‘standard fit’- harmonisation is something that will make an Indian mil watcher cry


Why was the last of the P-15Bs not delivered with even the ‘old’ SGRM housing though? If it’s the same ‘Covid supply chain’ excuses then it’s further proof India needs to keep buying at scale so ecosystems are more resilient and higher capacity in India
 

Latest Replies

Featured Content

Trending Threads

Back
Top