Indian Railways

Train won't necessarily be full of SR citizens. Most will still get LB. But incase during the time of reservation someone is mentioned to be above 60 they will automatically get LB if available.
They should include physically disabled in this as well.
Meh fair enough first they need to make sure reserved cabins are for the people who have reservations
 
Welp I think I was wrong my bad
IMG_1379.jpeg
 
Last edited by a moderator:
They cancelled for 5 crores? Alstom bid 150 crores ready for 145 crores but IR want at 140? L2 bid was 179 crores. We deserve ICF poor fit and finish coaches only..
This is old news, idk why it is being republished again. IR is not interested in aluminum body coaches on BG because very few sections can support 160 kmph (or more) as of now. The steel body VB project is progressing as originally planned.
 
They made right choice to cancel it. Kya hoga with such advanced trains?
Well then Vande Bharat is not needed then first fix genral class coaches then because people are travelling like cattles stuffed in those coaches.
 
Well then Vande Bharat is not needed then first fix genral class coaches then because people are travelling like cattles stuffed in those coaches.
We have to plan few of the overcrowded routes better.

Currently one of the most crowded routes run from Delhi --Lucknow -- towards east. The no of trains can be increased. Put more Vande Bharat during whole day till Lucknow/Prayagraj and then run fresh train from there onwards.
 
We have to plan few of the overcrowded routes better.

Currently one of the most crowded routes run from Delhi --Lucknow -- towards east. The no of trains can be increased. Put more Vande Bharat during whole day till Lucknow/Prayagraj and then run fresh train from there onwards.
Every long distance trains north south east west general class is stuffed like animals. No matter how much you plan that’s the only way for poor people to travel(few travel without ticket). Since General was reduced sleepers became general class and they reduced sleepers so that people flock AC coaches. We need to increase speed and run more trains and LHB trains can’t do that with heavy steel frame build from 90s tech.
We aren’t even attained 100 kmph avg speed.
 
We have to plan few of the overcrowded routes better.

Currently one of the most crowded routes run from Delhi --Lucknow -- towards east. The no of trains can be increased. Put more Vande Bharat during whole day till Lucknow/Prayagraj and then run fresh train from there onwards.

Increase speed, increase frequency, increase carriage capacity. Also I don't think it's fair to have separate classes for AC/non-AC. We don't do that in America. Every train has AC.
 
  • Like
Reactions: SKC
Such is the cost of doing business in India [for now]. Unless we want to perpetuate casteism myths particularly here in the west.
what does caste has to do with this, folks who are confused about gender will have trouble understanding anything.
this has more to do with affordability than other factors.
 

Latest Replies

Featured Content

Trending Threads

Donate via Bitcoin - bc1qpc3h2l430vlfflc8w02t7qlkvltagt2y4k9dc2

qrcode
Back
Top