- Joined
- Jul 3, 2024
- Messages
- 248
- Likes
- 1,297
Place the orders of 97 Tejas now
Doesnt govt already placed, i think 1 month there was a news !Place the orders of 97 Tejas now
No, only DAC approval came. This will be followed by CCS approval and then final order placement. Still several months away, unless fast tracked.Doesnt govt already placed, i think 1 month there was a news !
The new engine is delivered to HAL Bengaluru facility and will be fitted with the production aircraft in line which hasn’t received any engine. All those 4-5 Tejas built will be in Category B engines only for time being.Better late the never .. eh ?
Sarcasm aside , the new engine was delivered 2 months ago and the news from ADA was that the airframes are ready waiting for engine integration ...now this first one is outfitted with an old engine![]()