Indian Air Force: News & Discussions

I am sure the GCAP participants are really driven, but the goi has plans which are not known to foreign public.

So let's try and keep yourselves out of their plans and not impose your own timelines on the Bharatiya defence forum.

Which means underestimation is always comfortable for the underestimated.
I do not think GoI has a plan or had a plan even a short term one. most likely they don't care about nation's security, past governments used to take kick backs but at least made sure armed forces get at least the bare minimum to keep the country safe I don't see anything like that in Modi 's govt most of the stuff he does is just posturing to keep his image as a strong leader. In past 11 years he has just signed a single multirole fighter jet deal that too for only 36 rafale.More 36 could have been ordered just after delivery of initial deal completed but for some unknown reasons they didn't. No refulers and no awacs were odered despite dire need of em at last Iaf had to lease a tanker to make sure they don't loose know how of mid air refueling and pak now has more aewcs aircraft than us.
Ins Vikrant is sailing for past 3 years yet no deal for rafale m has taken place.
Navy is giving mlu to 40 year old types 209 subs so that they could extend its life to 50 years no navy operates such old submarines yet p75i hasnt been executed yet.
 
I do not think GoI has a plan or had a plan even a short term one. most likely they don't care about nation's security, past governments used to take kick backs but at least made sure armed forces get at least the bare minimum to keep the country safe I don't see anything like that in Modi 's govt most of the stuff he does is just posturing to keep his image as a strong leader. In past 11 years he has just signed a single multirole fighter jet deal that too for only 36 rafale.More 36 could have been ordered just after delivery of initial deal completed but for some unknown reasons they didn't. No refulers and no awacs were odered despite dire need of em at last Iaf had to lease a tanker to make sure they don't loose know how of mid air refueling and pak now has more aewcs aircraft than us.
Ins Vikrant is sailing for past 3 years yet no deal for rafale m has taken place.
Navy is giving mlu to 40 year old types 209 subs so that they could extend its life to 50 years no navy operates such old submarines yet p75i hasnt been executed yet.
There is a plan to compensate for our cucked air force, govt is investing heavily in srbms and air defence
 
I do not think GoI has a plan or had a plan even a short term one. most likely they don't care about nation's security, past governments used to take kick backs but at least made sure armed forces get at least the bare minimum to keep the country safe I don't see anything like that in Modi 's govt most of the stuff he does is just posturing to keep his image as a strong leader. In past 11 years he has just signed a single multirole fighter jet deal that too for only 36 rafale.More 36 could have been ordered just after delivery of initial deal completed but for some unknown reasons they didn't. No refulers and no awacs were odered despite dire need of em at last Iaf had to lease a tanker to make sure they don't loose know how of mid air refueling and pak now has more aewcs aircraft than us.
Ins Vikrant is sailing for past 3 years yet no deal for rafale m has taken place.
Navy is giving mlu to 40 year old types 209 subs so that they could extend its life to 50 years no navy operates such old submarines yet p75i hasnt been executed yet.
I believe it's a very long term plan, yeah it's true that he's not signing fighter and submarine deals but on the other hand he has fast tracked the ssbn/ssn program, Tejas mk2, stealth ucavs, attack drone swarming soft and hardware, the hlft 42 (the Marut will become a supersonic fighter in its new iteration.) and has kept the mig 29k crew in mind.

where their training and routine hasn't become 2nd rate, where all the conversion pilots are busy in France and the squadrons are incomplete with out their senior expert pilots.

So this two aircraft naval problem becomes a very minuscule issue when the deal is signed at the right time of the formers' (mig 29k) life span.

And remember the stealth black hawk? We might have some thing similar hidden somewhere. So I am optimistic.

Think long term is all I can say about all this.
 
the other hand he has fast tracked the ssbn/ssn program,
You are mistaken Modi has actually slowed down Ssn program navy wanted to get ccs clearance for p75 alpha back in 2020 but Modi didn't agreed he deemed the project to be too expensive, then navy chief talked to him himself but he didn't budged. https://www.indiatoday.in/magazine/defence/story/20210426-india-s-nuclear-sharks-1791817-2021-04-17
Navy managed to get the project cleared in 2024 but for only two subs instead of 6 and at the cost of letting IAC 2 go.

And Ssbn project s5 yet to take off facility where they will be built is still under construction and at least is 2years away from commissioning.
 
You are mistaken Modi has actually slowed down Ssn program navy wanted to get ccs clearance for p75 alpha back in 2020 but Modi didn't agreed he deemed the project to be too expensive, then navy chief talked to him himself but he didn't budged. https://www.indiatoday.in/magazine/defence/story/20210426-india-s-nuclear-sharks-1791817-2021-04-17
Navy managed to get the project cleared in 2024 but for only two subs instead of 6 and at the cost of letting IAC 2 go.

And Ssbn project s5 yet to take off facility where they will be built is still under construction and at least is 2years away from commissioning.
The follow on Project 75 A was fast tracked due to the docks being ready with the original P 75 scorpene submarines contract infrastructure. I believe the ssn program will be fast tracked soon.

IAC-2 I think will come with our own tedbf, I think that's why the goi is waiting and not letting anymore Rafale-m come our way.

The ssbn project is expected to be a minimum 5 year project only for the 1st sub to be commissioned. I might be wrong about the time taken though.

This topic is for the Navy section anyway.
 
You are mistaken Modi has actually slowed down Ssn program navy wanted to get ccs clearance for p75 alpha back in 2020 but Modi didn't agreed he deemed the project to be too expensive, then navy chief talked to him himself but he didn't budged. https://www.indiatoday.in/magazine/defence/story/20210426-india-s-nuclear-sharks-1791817-2021-04-17
Navy managed to get the project cleared in 2024 but for only two subs instead of 6 and at the cost of letting IAC 2 go.

And Ssbn project s5 yet to take off facility where they will be built is still under construction and at least is 2years away from commissioning.

8 out of 10 defence contracts inked under this government has been for the sole purpose of creating news headlines... means they were much below required numbers. Whatever be the required numbers... do a token buy to create a news for chutiya janta.
 

Latest Replies

Featured Content

Trending Threads

Back
Top