Thank god, it's a Jaguar. Six Tejas MK1A are ready to be delivered to IAF. So no worries this aircraft will be replaced soon. Both Jags and MiGs needs to be replaced ASAP. If GE is able to deliver only 24 Engines per year then that will be our production rate. In the mean time, HAL has promised to sign the deal for F414 Engines which will be fitted on MK2 by March 2026. I hope they don't fuck this up. Our production line should never be ideal for the next 15 years. They need to be churning out fighter jets every month.
If HAL keeps it's word next year 24 Tejas MK1A jets will be delivered. It is very disappointing with respect to the timelines for upgrading SU-30MKI. The upgrades will run into 2030s. PMO should immediately call stakeholders for a emergency meeting and come up with solution to feel the gaps in IAF inventory. Promise them businees for the next 20 years. In the mean time, we need 54 Rafales has a backup. Better spend the money on Rafales than Javalines.