Dude, there is a huge difference between "exporting" to your vassals and exporting to sovereign independent nationsYou know,F35, Su29/30, Mig29K, M2000 and even FC1 were exported even before mass induction into own air forces. Infact the list is quite long
a closer look than pics posted before..
====
The most ignored or missed out we say platform during AeroIndia25
The Mi-17V5 upgrade was displayed with a ton of new sensors and armaments!Pic
1: Minigun on the port-side doorPic
2: Full packagePic
3: FCR for Spike ATGM & S80 rocket podPic
4: FCR for Spike NLOS
5: Left-Back profile with full loadout
6: Spike & S80 rocket Pod front-profile
7: EO/IR Pod
8: Spike NLOS-5, S80 RP & FCR for Spike
View attachment 25806
View attachment 25808
View attachment 25809
View: https://x.com/ThatArticleGuy/status/1893161785395695914
Eh ? Wassup bro, how much did they pay you in Chandigarh to change your name from dalal to daya and try to influence us poor dfbiyasKeep cool, nothing is going to happen. Imports will be there. Tejas ko chhodo.
He is too apportunistic to be taken seriously, always plays(grabs money from) both sides.Have heard AIM multiple times saying that the GE deal had slow engine delivery in their timeline.
On top of that potshot on HVT![]()
Its sarcasm.. Spike NLOS is good choice. Got 20 km range in slightly smaller package than HELINA. Spike NLOS should also go in LCH and WSI Dhruv. I just hope latter two dont have fuel leaking issue still.Helina bechaari....![]()
View: https://youtu.be/7yCl_OYWwlg
Have heard AIM multiple times saying that the GE deal had slow engine delivery in their timeline.
On top of that potshot on HVT![]()
Did that delay was included in the earlier timeline of march 23? if not, then I don't know why GE is silent when HAL is dragging their reputation through the mud. GE are global player and take their PR very seriously.Yes it is true, GE had been ringing the warning bell for years before HAL signed the deal, and when they did, they had clearly indicated delays are nigh impossible to avoid given they were being asked to reopen a shut production line.
Because if GE speaks out, they know some chutiya babu in MoD will cancel any prospects of future orders.Did that delay was included in the earlier timeline of march 23? if not, then I don't know why GE is silent when HAL is dragging their reputation through the mud. GE are global player and take their PR very seriously.
isn't it quite the opposite, our Tejas, mk2 and AMCA are all designed around GE's engines. So they literally have monopoly over india's aero engines..Because if GE speaks out, they know some chutiya babu in MoD will cancel any prospects of future orders.
Indeed. India set out to develop a turbofan to avoid reliance on foreign suppliers for engines but did not develop its own turbofan. Not for want of trying, some might say. Very much for want of trying, I would say.isn't it quite the opposite, our Tejas, mk2 and AMCA are all designed around GE's engines. So they literally have monopoly over india's aero engines..
Stream/ live sectionIf anyone has access to the DDRs indigenization appreciation hour please post it here ... It looks like it got removed . It had a pretty good summary on all the different options under which the F35 could operate here (none good).
View: https://youtu.be/7yCl_OYWwlg
Have heard AIM multiple times saying that the GE deal had slow engine delivery in their timeline.
On top of that potshot on HVT![]()
Helina .. teri bahan ko naman,Helina bechaari....![]()