Indian Economy




One more reason why not joining the cheeni sponsored RCEP was a good decision. Indon textile industry is getting decimated.
 
News is still awaiting confirmation. Still what is wrong with these morons? Why are they making things complicated? Are we spending $15 billion to get a train which max out at 250 km/h? It is high speed rail which runs at 320 km/h ofcourse it won't come at the price of Shatabdi or Vande Bharat express.

I am not sure what you are finding wrong here!

Our indigenous High-Speed trains will be rated to speed of 250KMPH at first. We are not directly moving to above 300KMPH trains.

Also, the High Speed network does not always have trains running at 300-320KMPH. The average speed can be anywhere from 220 to 280KMPH. These routes also share track with other 200-250KMPH speed trains.

So, we might see the Japanese built trains running at top speed during peak time and rest of the day we can run these 250kmph speed indigenous trains.​
 
I am not sure what you are finding wrong here!

Our indigenous High-Speed trains will be rated to speed of 250KMPH at first. We are not directly moving to above 300KMPH trains.

Also, the High Speed network does not always have trains running at 300-320KMPH. The average speed can be anywhere from 220 to 280KMPH. These routes also share track with other 200-250KMPH speed trains.

So, we might see the Japanese built trains running at top speed during peak time and rest of the day we can run these 250kmph speed indigenous trains.​
Wrong. They specifically stated for Mumbai to Karnavati route, there will be 2 types of trains. One is direct Mumbai to Karnavati which will run top speed at 320 km/h non stop in 2 hours. Another will stop at stations which are constructed and reach destination in 3 hours.

We were supposed to get E5 Shinkasen model. It is extremely disappointing after spending billions and waiting for over a decade we are getting a 250 km/h train. First, let these fools upgrade the present tracks and by all means run trains at 220 km/h as planned. HSR track is also standard gauge. This will push the project beyond 2030 given our previous history with completing projects.
 
Wrong. They specifically stated for Mumbai to Karnavati route, there will be 2 types of trains. One is direct Mumbai to Karnavati which will run top speed at 320 km/h non stop in 2 hours. Another will stop at stations which are constructed and reach destination in 3 hours.

We were supposed to get E5 Shinkasen model. It is extremely disappointing after spending billions and waiting for over a decade we are getting a 250 km/h train. First, let these fools upgrade the present tracks and by all means run trains at 220 km/h as planned. HSR track is also standard gauge. This will push the project beyond 2030 given our previous history with completing projects.
I don't know what you are reading. We are getting trainsets from Japan which will run at their said speed of 320KMPH.
In addition to that we will be running our indegenously developed trainset which will run at 250kmph speed.

I don't why every action or project by govt is viewed as wrong and disappointing!​
 

Latest Replies

Featured Content

Trending Threads

Donate via Bitcoin - bc1qpc3h2l430vlfflc8w02t7qlkvltagt2y4k9dc2

qrcode
Back
Top