- Joined
- Jun 30, 2024
- Messages
- 305
- Likes
- 1,656
It could be sabotage. If thats the case as seen from past few month from news of various attempt of sabotages .. there is little Railways can do other than employ technology or manual personnel to monitor or inspect all lines...View attachment 11955
View attachment 11956
View attachment 11957
View attachment 11958
View attachment 11959
Nearly 20 accidents this year already. The Railways is staffed by too many lazy ignorant scumbags who don't give two shits.
NIA on the spot.It could be sabotage. If thats the case as seen from past few month from news of various attempt of sabotages .. there is little Railways can do other than employ technology or manual personnel to monitor or inspect all lines...
It could be sabotage. If thats the case as seen from past few month from news of various attempt of sabotages .. there is little Railways can do other than employ technology or manual personnel to monitor or inspect all lines...
You need cameras and sensors in Sky: fleet of drones. It would require some lateral thinking.The saboteurs will break the cameras too if you install them.
At least go through the previous posts on railways/infra thread before commenting! They are prototyping this thing from scratch - you expect them to develop 400+ kmph capable trainsets right off the bat? MAHSR will feature shinkansen trainsets (part of GoI's deal with the JICA); this development is unrelated.Only 280 kmph? Japan's go at least 350 or upwards to 420.