- Joined
- Jul 1, 2024
- Messages
- 2,861
- Likes
- 12,570
So you're actually expecting HAL in 2030 to churn out 28 Mk-1a of the second tranche of 97 nos Mk-1a thru 3 existing lines ( 2 in HAL Bangalore & 1 in HAL Ojhar) plus 108 odd Mk-2 by 2035.83+97 aka 180 Tejas mk1a can be delivered in just 6-7 yrs with production rate of 24-28 jets/year.....
By 2031-32 all 180 Tejas can be delivered and HAL can get production lines ready for MK2....
HAL is just doing Final assembly of individual parts of MK1A being made by Pvt Sector....
View attachment 26070
Major road block here is production rate of F404 engine......Which can't be resolved easily
You can have 69 different final assembly lines by pvt sector and rollout airframes without enginestabi bhi Maaza nahi aaayega
.......
Only solution to our problem is mating Tejas MK1A & Kaveri "with what ever Thrust it produces be it 70-75 Kn"....
So we will atleast have Tejas which is underperforming Rather than empty HAS in air bases....something is better than nothing....
We are in this worse situation bcoz of BSDK's who stopped Funding of KAVERI.....
Imagine having Kaveri producing 85 Kn ready by now....
Even after all this shit IAF is not willing to give a single Tejas MK1A to GTRE for flying Kaveri
Our current air thief is a big& cunning
at same time and he is on mission to give our balls to americucks or ruskies....bcoz he knows MRFA's death is near bcoz of Tejas mk2
5 different products from 5 different places saaar.......
Low hanging fruits saar.....
Technology delayed is Technology denied saaar.....
That clownshould be removed asap....
IMO RKS sir is Billion times better than current air chief......
If you're going to come up with HAL can set up more lines, I hope you aren't thinking of this

View: https://youtube.com/shorts/mvy-Gd9KEfU?si=1rana6lhd5ZiZQLd
For even these lines have certain pre requisites like manpower hiring , training, cost of land to set up the assembly line, tools - jigs, assembly fixtures et al, not to mention the fact of what are you going to do with these surplus workers once full production is achieved.
Tell me you've ABSOLUTELY zero experience in how a factory leave aside how an organization is run without telling me you've ABSOLUTELY zero experience in how a factory leave aside how an organization is run .