AMCA - Advanced Medium Combat Aircraft

IAF may need to confront Pakistani J-31 in 5 years. China will likely have hundreds of 5G aircraft in a few years. How do you suggest IAF fields a credible air defence before AMCA Mk1 is delivered, possibly not until the late 2030's - or even later?

I think Rafales & MWF would be enough for J-31. Yea it'll be like a bit stealthier Jf-17, that's why I said we might get a few Su-57 as stopgap if there's too much dhoti shivering as a 2nd manufacturing source of fighters to expand the induction rate.

Su-75 doesn't exist, or what it'd be offered in MRCA. Plz stop bringing it up.
 
I think Rafales & MWF would be enough for J-31. Yea it'll be like a bit stealthier Jf-17, that's why I said we might get a few Su-57 as stopgap if there's too much dhoti shivering as a 2nd manufacturing source of fighters to expand the induction rate.

Su-75 doesn't exist, or what it'd be offered in MRCA. Plz stop bringing it up.
The Pakis won't be able to afford the J-35 in meaningful numbers. They have budget issues with the J-10 already. Don't know what'd be inside the J-35 but design wise it's a stealth fighter. GoI needs to stop dragging it's foot in regards to DRAL and make a quick decision with the additional Rafales (AF+Navy), and order quick. Even the Tejas production is too slow, Mk1As are stuck because of engines, and Mk2 hasn't even seen a prototype being ready. This is shaping up to be a frustratingly slow decade for Indian fighter acquisition.
 
The Pakis won't be able to afford the J-35 in meaningful numbers. They have budget issues with the J-10 already. Don't know what'd be inside the J-35 but design wise it's a stealth fighter. GoI needs to stop dragging it's foot in regards to DRAL and make a quick decision with the additional Rafales (AF+Navy), and order quick. Even the Tejas production is too slow, Mk1As are stuck because of engines, and Mk2 hasn't even seen a prototype being ready. This is shaping up to be a frustratingly slow decade for Indian fighter acquisition.

I doubt it will even be sold to them.
Chinkus are slowly realizing their long-time slave has now found a new master

 
I doubt it will even be sold to them.
Chinkus are slowly realizing their long-time slave has now found a new master

The J-35 is supposed to be Chink's Naval Fighter and do everyone think they will give that to Pakistanis?

Even if the Internals are downgraded, remember that Chinese and all other Stealth Fighter Operators go great lengths like installing Luneberg Lens to hide true RCS. It would be a guarantee that J-35 RCS will be known to CIA in few days these Jahils get it.
 
The Pakis won't be able to afford the J-35 in meaningful numbers. They have budget issues with the J-10 already. Don't know what'd be inside the J-35 but design wise it's a stealth fighter. GoI needs to stop dragging it's foot in regards to DRAL and make a quick decision with the additional Rafales (AF+Navy), and order quick. Even the Tejas production is too slow, Mk1As are stuck because of engines, and Mk2 hasn't even seen a prototype being ready. This is shaping up to be a frustratingly slow decade for Indian fighter acquisition.
J-35 is the Naval version. FC-31 is the land based version which'd take at least 4-5 years to be realised. Besides I don't think as long as Trump is around , they'd risk getting such platforms from the Chinese.

J-10 was offered to Paxtan by the Chinese on credit at "reasonable " interest rates. Besides it's a export version , the same as the FC-31 as & even it'd be exported to PAF.

Hopefully the deal for the Rafale M will be signed before the end of this financial year or at least that's the plan going by reports. More Rafales for IAF would only come thru the MRFA tender.

The boat for getting 36 nos more has long since sailed . Would've been possible up until early 2022 . Today Dassault has a full order book & given the disruptions in supply chains it's expected that their assembly lines will be working to clear the back log till the end of this decade.

A slim chance of Dassault establishing am assembly line here exists if we give them an order for at least 100 nos FA . From my chats with French members on another forum , I believe even if the immediate order is for 75+ nos the French government will persuade Dassault to consider it on the condition that eventually GoI will enhance their procurement.

But frankly do you see the Modi government going in for 54 nos ( IAF) + 26 nos (IN) order ? I don't. For all his bravado 56" has been spooked by Pappu after the last time the latter went public with allegations of underhand dealings between the GoI & Dassault.

After the recent general elections where the Dalits successfully bought the opposition's proposition of Modi seeking 400 seats to do away with reservations do you think he'd go in for a G2G deal with the French ?

56" should've exercised the option for another 36 additional Rafales immediately after the Galwan clashes or somewhere in 2020 itself. Even if Pappu raised objections the GoI could've easily tackled him by convincing the public he's acting against the national interest.

In hindsight we can say that was our best chance as even Dassault's order books were running empty then . Modi blew up our chances then & there.
 
The Pakis won't be able to afford the J-35 in meaningful numbers.

AMCA prototype is too come in 2027, Induction is expected st 2032. That's a long time for Pakistan to get few FC-31s as "indigenously developed jet". J-10 is high end got never exported before, this one is more likely to be made lower for export market.
That, J-20 mass production, coupled with define random news tidbits is what made me think Su-57 limited induction possible.

The MRCA clusterfuck is confusing at it is. SH-18 would have had the highest chance due to engine commonality with AMCA, but now we already have Rafale-M to cover till 2050+ (what of TEDBF then?)
We can't be getting Eurofighter & Gripen. Mig-35 has low chances, although it will build on our Mig-29 use. Su-35 & F-15 are even more unlikely. It's were getting a heavy then Su-57, with all its faults, still comes ahead of them.

What are the options then.. old Mirages?

We do need multiple sources to build numbers.
 
AMCA prototype is too come in 2027, Induction is expected st 2032. That's a long time for Pakistan to get few FC-31s as "indigenously developed jet". J-10 is high end got never exported before, this one is more likely to be made lower for export market.
That, J-20 mass production, coupled with define random news tidbits is what made me think Su-57 limited induction possible.

The MRCA clusterfuck is confusing at it is. SH-18 would have had the highest chance due to engine commonality with AMCA, but now we already have Rafale-M to cover till 2050+ (what of TEDBF then?)
We can't be getting Eurofighter & Gripen. Mig-35 has low chances, although it will build on our Mig-29 use. Su-35 & F-15 are even more unlikely. It's were getting a heavy then Su-57, with all its faults, still comes ahead of them.

What are the options then.. old Mirages?

We do need multiple sources to build numbers.
Build new MKIs with the proposed upgrade package. 2-3 more squadrons. Or Order two squadrons of Su-57s with option for license manufacturing. Rafale is the only aircraft that'd win MRFA, requires diplomacy to start local production to meet induction rates, and the French will reasonably demand almost a 100 total orders. Up to GoI to sell this in the parliament using National security and "boost to local economy" angles. Once the GE404 drama is solved, double the Mk1A production rates to at least 30 aircrafts a year. Open additional facilities as needed, these will later be used for Mk2/AMCA/TEDBF lines. Order atleast 350 MK2s to assure HAL for future orders so they speed up production. We simply HAVE to build/induct more or less 2 squadrons every year for the next 10 years. We need to keep up the high Tejas production rates, AND keep two separate lines open for licensed fighters like Rafale and Su-30/57. While simultaneously figuring out how much private sector involvement we want for AMCA and set in stone the workload share. Because by the time Mk2 goes into production, the AMCA production plans better be solid and ready for an empty line. Now for all of these simple goodies I mentioned, there's this not so simple mammoth issue of budget. $5.5 billion a year won't cut it. TEDBF I have honestly no clue, I doubt it's even in active development. IAF is not interested in it, and Navy doesn't get enough budget to think about it deeply right now. If local production of Rafale-Ms are set up, they'll be content with those. More Migs are a bad idea because of their subpar availability rates, and Klimov more or less gave up further developing the RD series engines after the MK. Old Mirages we get from here and there will only be cannibalized for parts.​
 

Latest Replies

Featured Content

Trending Threads

Donate via Bitcoin - bc1qpc3h2l430vlfflc8w02t7qlkvltagt2y4k9dc2

qrcode
Back
Top