They are top heavy. Remember the Godavaris are derivatives of the og Leanders. Brahmaputras didnt really address the structural changes needed vis a vis feature creep and added tonnage.Could it be a design flaw with the Brahmaputra class vessels?
They are top heavy. Remember the Godavaris are derivatives of the og Leanders. Brahmaputras didnt really address the structural changes needed vis a vis feature creep and added tonnage.Could it be a design flaw with the Brahmaputra class vessels?
Oh absolutely. Naval Dockyard Mumbai is the most incompetent useless liability of an organization.
The sheer shitfuckery that goes on there is unbelievable. And why the IN is fucking fed up. Theyre moving all platforms of WNC to Karwar, because that dockyard is navy run and uncorrupt.
Shit is so bad that IN literally towed away the incomplete Delhi MLU to Vishakapatnam ND to complete her.
Can you guesstimate why the ship listed to one side? I don't have much knowledge about the architecture of military ships, but as far as I've heard they have high metacentric height which means they should be less susceptible to such incidents.
why not end this shipyard i think they have caused enough damage already better give the shit to mdl or other reputed yards like lnt/cochinFire was hot enough and widespread enough to weaken the hull.
Hull buckled under the superstructure
Water swept in.
Ship was pierside, undercrewed and thus Damage Control was not done, if at all.
Flooding accelerated, and then she tipped over.
Vested interests all the way up and down the chain.why not end this shipyard i think they have caused enough damage already better give the shit to mdl or other reputed yards like lnt/cochin
either ways its good we are not having shortage of hulls many ship would be rolling in next 1-3 year timeline
These things are mostly happening due to Poor work ethics of Indian workforce, negligence and no adherences to the Protocols and Processes.Although I want to give them a benefit of doubt, it has happened way to many times and it keep happening again and again.
There was this post on 4chan from a US navy office who narrated that Indian Navy does it work in a juggad manner. Exposed wires was one of the major nitpick. Could it be this was a electrical mishap that led to fire.
How did it get this much damage by just fire?
View: https://x.com/BharatShaktiBSI/status/1815397165394452776
this blackpiling needs to stop.What are these people gonna do when anti-ship missiles hit their ships?.. Join the Moskva gang perhaps
In other news, INS Triput (Batch 3 Talwar Class) was launched today by Goa Shipyard Limited.
View: https://x.com/Defencematrix1/status/1815597809640358040
No more Russian ships@haldilal as I said, Talwar-class frigade made my GSL took only 3 years to complete. The keel was laid down on 29 January 2021. I don't see a reason why we can't add more order to this class as INS Brahmaputra replacement.
Why not get them to produce more P 17A class FFGs?? Or the dry docks are not large enough for that??@haldilal as I said, Talwar-class frigade made my GSL took only 3 years to complete. The keel was laid down on 29 January 2021. I don't see a reason why we can't add more order to this class as INS Brahmaputra replacement.
Previously, they had no expertise and experience in building FFG and DDG. Only one shipyard i.e MDL was capable of doing it. Now, GRSE is doing it too. In future we might see GSL also being roped to build frigates.Why not get them to produce more P 17A class FFGs?? Or the dry docks are not large enough for that??
Add L&T to that list.Previously, they had no expertise and experience in building FFG and DDG. Only one shipyard i.e MDL was capable of doing it. Now, GRSE is doing it too. In future we might see GSL also being roped to build frigates.
Oh absolutely. Naval Dockyard Mumbai is the most incompetent useless liability of an organization.
The sheer shitfuckery that goes on there is unbelievable. And why the IN is fucking fed up. Theyre moving all platforms of WNC to Karwar, because that dockyard is navy run and uncorrupt.
Shit is so bad that IN literally towed away the incomplete Delhi MLU to Vishakapatnam ND to complete her.