- Joined
- Jun 30, 2024
- Messages
- 655
- Likes
- 6,801
Don't forget this, if it reaches the surface we will be the first in decades to stream some cool pictures of venusian surface.ISRO should send a high quality camera,instead of their usual shitty cameras like in CY-3' lander imager cameras. This mission will be one of its kind, just like how Chandrayaan-1's Moon Impact Probe discovered water during its descent, I hope this too discovers something significant and path breaking
No need to survive for a week,just few hours is enoughI think one of the constraints of that is the environment of Venus is really hostile to modern electronics, so fitting a camera would mean that it would be made from materials that could withstand the Venusian atmosphere for atleast a week, and I am not sure how much leeway that gives for quality pictures
Venera landers were cased in housings designed by engineers working on Soviet submarine programsNo need to survive for a week,just few hours is enough
Those are molten lead or metal that fell from the spacecraft as it descended down. Probably remnants of antennas or metal parts sticking out of the heat shield.hope its a lander mission , only images of surface is old mission from soviets
supposed to be mushrooms there
goes on to show how much corrosive venus' surroundings can get
Venera landers were cased in housings designed by engineers working on Soviet submarine programs
Still managed to survive only around 40 minutes on venusian surface, goes on to show how much corrosive venus' surroundings can get
View: https://youtu.be/nvPSetMCToI?si=6mVSSMPfnyf9oFLA
Your translation is need here for the above video
1. Total gaganyan missions increased to 8.
2. NGLV first development launch in 7 to 8 years. Three developmental launches sanctioned. 3rd launch pad to be made. NGLV first stage to be landed on a barge.
3. BAS 1st module will be launced in 2028 using lvm3.
4. Talks about CY3, venus mission, data relay sats for gagan.
I think gaganyan mission will take more time, not even one full configuration flight happen till now. Atleast 3 mock test require.1. Total gaganyan missions increased to 8.
2. NGLV first development launch in 7 to 8 years. Three developmental launches sanctioned. 3rd launch pad to be made. NGLV first stage to be landed on a barge.
3. BAS 1st module will be launced in 2028 using lvm3.
4. Talks about CY3, venus mission, data relay sats for gagan.
AnnadeIs this kurup from PDF??
8 missions = 3 unmanned mission + first manned mission + 4 more manned missions.I think gaganyan mission will take more time, not even one full configuration flight happen till now. Atleast 3 mock test require.
Since Somnath sir himself have confirmed about the descent probe, let's wait for some more time , the render of the orbiter is not latest, it is atleast 2 years old
Seems descent module missing on venus probe !