- Joined
- Jun 30, 2024
- Messages
- 1,736
- Likes
- 11,127

But America will create supply chain issue for Tejas and AMCA project in retaliation.
Which in turn will only result in the redesigning of the Tejas Mk2 to fly with an AL-41. Delay AMCA further, and possibly even scrap the MK1 medium design (in case the Safran-GTRE JV doesn't work out); opting for a larger heavier aircraft with twin AL-41s/derivatives. Americans enacting CAASTA only forces our hands and sours whatever good will was built up in the last 20 ish years. It'll delay our programs but Americans themselves will get a fat L in return.